Answer:
????
Step-by-step explanation:
in graph? is in a graph
Answer:
3 machine
Step-by-step explanation:
It is given that 6 machine each working at the same rate can complete the work in 12 days
We the has to complete in 8 days
Let we need x extra machine to complete the work in 8 days
So total number of machines =x+6
Now according to man work day equation 



x=3 machine

<u>Step-by-step explanation:</u>

Answer:

Step-by-step explanation:

It seems this system of equations would be solved easier using the elimination method (the x and y values are lined up).
Multiply everything in the first equation by -2 (we want the 4x to be able to cancel out with a -4x).

Now line up the equations (they are already lined up - convenient) and add them from top to bottom.

The -4x and 4x are opposites, so they cancel out.
Adding 6y and 2y gives you 8y, and adding -12 and 4 gives you -8.

Divide both sides by 8.

Since you have the y-value you can substitute this in to the second (or first equation, it doesn't necessarily matter) equation.

Simplify.

Add 2 to both sides.

Divide both sides by 4.

The final answer is
.

It will take 8 minutes.
You use a proportion
5/1=2400/x you use 2400 because 2.4km=2400 meters and u need to use the same unit of measurement.
so cross multiplying gives you 5x=2400 which is equal to 480. BUT this is 48 seconds, and it asks you how many minutes, not seconds. So, you divide by 60 because there are 6 seconds in a minute, and you get 8.