The linear model of this case takes the form:
y = a(x-b) + k
<span>The cost of having a package delivered has a base fee of $9.70
this is "k" >>>>> k=9.7 (fixed amount of fee)
THEN
</span>
<span>Every pound over 5 lbs cost an additional $0.46 per pound
that means: 0.46(x-5)
in other words, if the package weighs foe example 9 pounds, then 9-5=4, it will cost 0.46*4 for these 4 extra pounds
Finally we have the linear form of this: C = 0.46 (W - 5) + 9.7
</span>
The second matrix
represents the triangle dilated by a scale factor of 3.
Step-by-step explanation:
Step 1:
To calculate the scale factor for any dilation, we divide the coordinates after dilation by the same coordinated before dilation.
The coordinates of a vertice are represented in the column of the matrix. Since there are three vertices, there are 2 rows with 3 columns. The order of the matrices is 2 × 3.
Step 2:
If we form a matrix with the vertices (-2,0), (1,5), and (4,-8), we get
![\left[\begin{array}{ccc}-2&1&4\\0&5&-8\end{array}\right]](https://tex.z-dn.net/?f=%5Cleft%5B%5Cbegin%7Barray%7D%7Bccc%7D-2%261%264%5C%5C0%265%26-8%5Cend%7Barray%7D%5Cright%5D)
The scale factor is 3, so if we multiply the above matrix with 3 throughout, we will get the matrix that represents the vertices of the triangle after dilation.
Step 3:
The matrix that represents the triangle after dilation is given by
![3\left[\begin{array}{ccc}-2&1&4\\0&5&-8\end{array}\right] = \left[\begin{array}{ccc}3(-2)&3(1)&3(4)\\3(0)&3(5)&3(-8)\end{array}\right] = \left[\begin{array}{ccc}-6&3&12\\0&15&-24\end{array}\right]](https://tex.z-dn.net/?f=3%5Cleft%5B%5Cbegin%7Barray%7D%7Bccc%7D-2%261%264%5C%5C0%265%26-8%5Cend%7Barray%7D%5Cright%5D%20%3D%20%5Cleft%5B%5Cbegin%7Barray%7D%7Bccc%7D3%28-2%29%263%281%29%263%284%29%5C%5C3%280%29%263%285%29%263%28-8%29%5Cend%7Barray%7D%5Cright%5D%20%3D%20%5Cleft%5B%5Cbegin%7Barray%7D%7Bccc%7D-6%263%2612%5C%5C0%2615%26-24%5Cend%7Barray%7D%5Cright%5D)
This is the second option.
Function A is linear
y = 5/3x + 0
let me know if this is incorrect
Answer: 18
Step-by-step explanation:
Let x be the number of 2 point baskets made and y be the number of 3 point baskets made
:
1) x + y = 26
:
2) 2x + 3y = 60
:
solve equation 1 for x and substitute in equation 2
:
x = 26 - y
:
2(26 - y) +3y = 60
:
52 -2y +3y = 60
:
y = 8
:
x = 26 - 8 = 18
:
******************************
The team made 18 2-point shots
$421,369.20 , I just had this question on Apex.