There are different kinds of software implementation strategy. The software implementation strategy would you recommend in this situation to allow users fall-back access to the old system as the new one is implemented is parallel start up.
- Parallel running often called parallel start up strategy for system changeover where a new system slowly takes over the roles of the older system even when both systems operate.
This conversion often occur when the technology of the old system is outdated and as such a new system is needed to be installed to replace the old one.
The parallel running phase is the act of changing a fragment of business information technology operation to a new system.
Learn more about Parallel start up from
brainly.com/question/9343211
Assuming Victoria is using Adobe
Photoshop to create her brochure, below are the steps she is required to
follow.
She should first open the image on
Photoshop, click on the image option and select duplicate just in case the
resized image is not what she wants.
Still on the image option, she
should select Image size. A screen will pop up at this point, indicating the
image’s current size. For the purposes of image resizing, Victoria should
select Pixel dimensions category.
She should be able to type her preferred
dimensions for both the width and height. She should make sure ‘Constrain
Proportions’ is unchecked to be able to type in separate values.
If she decides to use the photo editing
program, she can simply click on the image, and if resize handles appear around
it, she can click and drag those to the desired size.
The answer would be (DOCSIS). :)
Have a blessed day and hope this helps!
You are finally at the stage of the software life cycle where you begin programming. What is this stage called?
development
USB ports, headphone jack/microphone port, and of course, a power button.