Answer:
No solution, this is not an arithmetic sequence
Step-by-step explanation:
An arithmetic sequence is the same number being added over and over. This is not the case.
Answer:
1
7 ✔️
15
21
Only 7 is a prime number in this question.
Answer:
95% Confidence interval for the mean

Step-by-step explanation:
We have to calculate a 95% confidence interval for the mean of a finite population.
The error is multiplied by the following finite population correction factor:

The standard deviation can be estimated as

The 95% confidence interval has a z value of 1.96, so it becomes:

Answer:
The point is in the 4th quadrant.
Explanation:
Given the ordered pair(4, -5), we have that x = 4 and y = -5. Plotting this point, we'll have;
Note that quadrants are labelled in an anti-clockwise direction with the top right portion of the graph as the 1st quadrant. Looking at the plotted point, we can see that it i in the 4th quadrant.
Answer:
I would say D because if you count how much they go up it's close. but if you dont agree I could also assume B.