Answer:
Mass of the steel cube = 7800 kg
Volume of the steel = 1.025 cubic centimetre
Explanation:
Given:
The density of the steel = 7.8
Side of the cube = 12 cm
<u>(1)The mass of steel cube :</u>
We know that,

We are given with density and sides of the cube
then volume of the cube
=
= 
= 1000 cubic centimetre
Now


mass = 7800 kg
<u>(2)volume of steel:</u>
Given the mass = 8 kg

Substituting the values


volume = 1.025 cubic centimetre
Jdkdibdoodbejdodjjdjsjsisjbdodoshdbbdd
Question
A banked highway is designed for traffic moving at v 8 km/h. The radius of the curve = 330 m. 50% Part (a) Write an equation for the tangent of the highway's angle of banking. Give your equation in terms of the radius of curvature r, the intended speed of the turn v, and the acceleration due to gravity g
Part (b) what is the angle of banking of the highway? Give your answer in degrees
Answer:
a. Equation of Tangent
tan(θ) = v²/rg
b. Angle of the banking highway
θ = 0.087°
Explanation:
Given
Radius of the curve = r = 330m
Acceleration of gravity = g = 9.8m/s²
Velocity = v = 8km/h = 8 * 1000/3600
v = 2.22 m/s
a . Write an equation for the tangent of the highway's angle of banking
The Angle is calculated by
tan(θ) = v²/rg
θ = tan-1(v²/rg)
b.
Part (b) what is the angle of banking of the highway? Give your answer in degrees
θ = tan-1(v²/rg)
Substituting the values of v,g and r
θ = tan-1(2.22²/(330 * 9.8)
θ = tan-1(0.001523933209647)
θ = 0.087314873580116°
θ = 0.087°
Answer:
The total work done by Brad each day is 176400 J
Explanation:
Hi there! The work done by a force (F) pointed in the same direction as the displacement (d) is calculated as follows:
W = F · d
The force applied is equal to the weight of Brad, that is calculated as follows:
Weight = m · g
Where:
m = mass of Brad
g = acceleration due to gravity (9.8 m/s²)
Then:
Weight = 60 kg · 9.8 m/s² = 588 N
Let´s find the vertical distance traveled by Brad each day:
He exercises 20 min per day. Each minute Brad does 60 steps. In total, Brad steps up (20 min · 60 steps/min) 1200 steps. If each step has a height of 0.25 m, the total distance traveled by Brad will be
(1200 steps · 0.25 m/step) 300 m.
Then, the total work done by Brad is
W = F · d
W = 588 N · 300 m
W = 176400 J
The total work done by Brad each day is 176400 J