Answer:
44 hours
Step-by-step explanation:
Decreasing the people by a factor of 2 means we have 3 people
The job takes 6* 22 = 132 people hours
When we decrease the people, it will take more hours
132 people hours = 3 people * t hours
Divide each side by 3
132/3 = 3t/3
44 = t
It will take 44 hours
Answer:
Length of other board
metres
Step-by-step explanation:
Given: Length of board =
metres
Length of board was divided into two.
Length of one piece =
metres
Let
= length of the other board
Length of the other board = Length of board - Length of one piece
So, 

Thus, length of the other board
metres
Answer:
119.4
Step-by-step explanation:
Big Brain Dude <:
Answer:
Step-by-step explanation:
im pretty sure it is 768/187.5 = about 4
because you are taking the highest number and putting it over the lowest number
Answer:
It's proved below
Step-by-step explanation:
We are given;
- K is the midpoint of JL
- M is the midpoint of LN
By definition of mid points, we can say that;
JK = KL and LM = MN
Now, we are given that JK = MN.
Thus, by substitution, we can deduce that; KL = LM
Thus is because JK can be replaced with KL and MN can be replaced with LM.
Thus, it is proved that KL = LM