Answer:
VF= $3.281,42
Interes= 3.281,42 - 3.000= $281.42
Step-by-step explanation:
Dada la siguiente información:
Prestamo (P)= $3.000
Tasa (i)= 0,015/2= 0,0075
Cantidad de periodos (n)= 6*2= 12 semestres
<u>Para calcular el valor final del prestamos, tenemos que usar la siguiente formula:</u>
VF= P*(1 + i)^n
VF= 3.000*1,0075^12
VF= $3.281,42
Interes= 3.281,42 - 3.000= $281.42
Answer:
Step-by-step explanation:
n - 66 = -35
n = 31
Answer:
12
Step-by-step explanation:
4*3=12
i really hope this help u :)
Answer:
See explanation
Step-by-step explanation:
Polygon WXYZ has vertices W(-1.5, 1.5), X(6, 1.5), Y(6, -4.5), and Z(-1.5, -4.5).
Find the slopes of all sides:
- horizontal line
- slope undefined, so the line is vertical
- horizontal line
- slope undefined, so the line is vertical
Vertical and horizontal lines are perpendicular, so all angles W, X, Y and Z are right angles. Hence, quadrilateral WXYZ is a rectangle
You want to begin by changing your units to the same thing. The problem uses minutes and hours, and according to time 1 hour is 60 minutes.
Since we have 2 hours we want to multiply 60 by 2 to get 120. According to the problem, the biker to an extra 30 minutes and adding that to the time we already calculated we get 150.
We can say, the biker took 150 minutes to go through 45 miles. To find out how many miles he took per minute, we divide them (45/150) to get that he or she went through 0.3 miles per minute.
Again, we know 1 hour is 60 minutes, so to get how many miles per hour we want to multiply .3 by 60. This gets us 18.
Therefore, the biker travels 18 miles per hour