Answer:
a. 95.4
b. UCL = 96.07
LCL = 94.73
c. Process is in control
Step-by-step explanation:
a. The computation of estimate mean is shown below:-
= 95.4
b. The computation of Upper Control Limit (UCL) and the Lower Control Limit (LCL) for the manufacturing process is shown below:-
= 95.4 + 0.67082
= 96.07
= 95.4 - 0.67082
= 94.73
c. The explanation is shown below:-
From the above calculation we can see that the sample lies between LCL AND UCL that is (94.73 ,96.07) ,
The Process is in control
Answer:
6 3/4x
Step-by-step explanation:
If you follow PEMDAS (Parenthesis, Exponent, Multiply, Divide, Add, Subtract) then you do what is inside the parenthesis first.
3 1/2 divided by 2= 1 3/4
1 3/4 plus 5= 6 3/5
Then, you add the x and since there is no other variable like x, then you just leave it with 6 3/4.
Hope that helped! :)
In the diagram, P1P2 and Q1Q2 are the perpendicular bisectors of AB and BC, respectively. A1A2 and B1B2 are the angle bisectors of ∠A and ∠B, respectively <span>the center of the circumscribed circle of ΔABC is P </span><span>because both perpendicular bisectors go through the center
where they cross must be the center.</span><span>
</span>
-2/1 because u have to do change in y over change in x