<span>1. </span>When given a raw score, it must be converted
into a z-score (standard score). Raw scores cannot be placed on a normal
distribution curve because they do not have the same means and standard
deviations, but when it is converted into a z-score, the number of standard
deviations above or below the population mean can be measured. The z-scores on
the center are average, the scores on the left are lower than average and the
scores on the right are higher than average.
<span>2. </span>A z-score is a standard score which can be
placed on a normal distribution curve. A z-score indicates the distance of the
standard deviations from the mean (center of the curve).
Answer:
The probability is 
Step-by-step explanation:
From the question we are told that
The percentage that are on time is p = 0.76
The sample size is n = 11
Generally the percentage that are not on time is



The probability that no more than 4 of them were on time is mathematically represented as

=> 


N/4 < -1 — we can multiply both sides with 4, so we dont have to deal with fractions.
N < -4
So, our N goes left from -4 on a number line.
-10x<-100 — divide both sides by 10
-x < -10
x > 10
X is from 10 rightwards.
5x>20 — divide both sides by 5
x > 4
X is rightwards from 4.
In exact form it is 7/2
In decimal form it is 3.5
In mixed number form it is 3 1/2
Answer:
It's supposed to be 4-7/1-8
Step-by-step explanation:
The formula for slope is y1 - y2 / x1 - x2 (subscript). So you would take the y value from (8,7) which is 7, and subtract by the y value from (1,4), which is 4. You do the same for the x values and you get 7-4/8-1, which is 3/7.