The distance between point J and line KL would be the line perpendicular to the line, which is line JM.
The answer would be B.
Answer:
mean = 70000
SD = 15239
X= 95000
Z = (X-mean)/ SD
= (95000-70000)/15239
= 1.64
Now from Z-Table
% of employees = 100(1-.9495) = 5.02%
L= 1/8
O=1/4
C=1/8
H=1/8
S=1/8
O or L=3/8
S or C=1/4
S or C or O=1/2
OR mean to add.
For the first one I got :
V = 165/8
V = B*h
(B)11/2 * (h)15/4
= 165/8
Pls correct me if im wrong!! :)