Given: lines l and m are parallel, and line t is a transversal.
angle pair result/justification
1 and 2 are equal (vertical angles)
6 and 8 are equal (corresponding angles)
1 and 4 are equal (alternate exterior angles)
4 and 8 are supplementary angles (i.e. add up to 180 degrees, a straight angle)
Note:
alternate angles are on opposite sides of the transversal, and each attached to a different (parallel) line.
If they are both enclosed by the parallel lines, they are alternate interior angles (examples: angles 2 and 3, 6 and 7)
If they are both outside of the two parallel lines, they are alternate exterior angles (examples: angles 1 and 4, 5 and 8)
Let's start by imagining a rock being thrown to the air.
Let's say that going up is the positive direction and so, going down is the negative.
The acceleration is pointing down (because of gravity) so it's always negative. While the rock is going up, it's velocity/speed is positive, but the acceleration is negative.
While the rock is going down, both acceleration and speed are negative.
This shows that the first statemente is true, but the second is false.
You can also think that if you define going DOWN as the POSITIVE direction, you can have both positive acceleration and speed, or positive acceleration and negative speed.
Answer:
x = -10
Step-by-step explanation:
Step 1: Write equation
7 + 11x + 60 = -13 + 3x
Step 2: Solve for <em>x</em>
- Combine like terms: 11x + 67 = -13 + 3x
- Subtract 3x on both sides: 8x + 67 = -13
- Subtract 67 on both sides: 8x = -80
- Divide both sides by 8: x = -10
Step 3: Check
<em>Plug in x to verify it's a solution.</em>
7 + 11(-10) + 60 = -13 + 3(-10)
67 - 110 = -13 - 30
-43 = -43
Answer:
t≅13.33h
Step-by-step explanation:
Adam (A) works at constant rate of 50tiles/h
Briana (B) works at constant rate of 55tiles/h, this means that A=50 tiles per hour and B=55 tiles per hour, then A+B = 105tiles/h together, but the floor consists of 1400tiles, so if 105 tiles are installed in one hour, then 1400 tiles in how long they will be installed?
t = 1400tiles*h/105tiles≅ 13.33 h
Answer:
244.965
Step-by-step explanation:
it is what it is