Answer: 
Explanation:
If r is the number of successes out of n trials , then the sample proportion of success = 
For binomial experiment , if the population probability of success p on a single trial is not given , then the best point estimate for probability of success p on a single trial is the sample proportion of successes.
i.e. a point estimate for the probability of success p on a single trial :

Hence, a point estimate for the probability of success p on a single trial = 
Answer:
d. increases the earnings of some low-skill workers while reducing the employment and training opportunities available to others.
Explanation:
Minimum wage is a form of price floor. It is the lowest amount that should be paid to labour for their services rendered. It is usually set by the government or an agency of government.
Minimum wage causes supply of Labour to exceed demand for Labour. Firms would demand less of Labour because of higher cost of Labour. Decreased demand for Labour would increase unemployment.
Minimum wage isn't a price ceiling but a price floor.
Minimum wage increases the income of Labour.
Answer: A.exceed units sold
Explanation:
In Absorption Costing, All costs be it Fixed or Variable that are directly related to production are considered when computing the Cost of Production.
Under Variable Costs however, only variable Costs are considered for the computing of Cost of Production.
This difference in consideration of costs under each method leads to difference in income determination under each method.
Under Absorption Costing, fixed manufacturing costs are apportioned on produced units and the costs are only recovered when the units are sold but under variable costing, fixed manufacturing costs are treated as period costs and are therefore charged to the Income statement.
This means that, the amount of income under absorption costing will be more than the amount of income under variable costing when units manufactured exceed units sold.
Answer:
Cost of capital = 12.40%
Explanation:
given data
cost of equity = 15.4 percent
pretax cost of debt = 8.9 percent
debt-equity ratio = 0.46
tax rate = 34 percent
to find out
What is the cost of capital for this project
solution
first we get Equity multiplier that is express as
Equity multiplier = 1 + debt-equity ratio ..................1
put here value
Equity multiplier = 1 + 0.46
Equity multiplier = 1.46
and
Weight of equity will be
Weight of equity =
....................2
put here value
Weight of equity = 
Weight of equity = 0.6849
and
Weight of Debt will be here
Weight of Debt = 1 - weight of equity ...........................3
put here value
Weight of Debt = 1 - 0.6849
Weight of Debt = 0.3151
so
Cost of capital will be here as
Cost of capital = Weight of Debt × pretax cost of debt × (1- tax rate ) + cost of equity × Weight of equity .....................4
put here value we get
Cost of capital = 0.3151 × 8.9% × (1 - 0.34) + 15.4% × 0.6849
Cost of capital = 12.40%