Answer:
Part of work left to finish after two work hours is 7/20
Step-by-step explanation:
Firstly, we need to calculate their joint work rate
That will be;
1/(1/5 + 1/8) = 1/(13/40) = 40/13
This means that they will complete the task in 40/13 hours
1 whole part takes 40/13
x part will take 2 hours
x * 40/13 = 2
40x = 26
x = 26/40
So the part that will be completed in two hours is 26/40
This means that the part left to complete will be:
1 - 26/40 = 14/40 = 7/20
Answer:
Adam needs 9/8 of a 5oz serving of shrimps (which equals to 5.625 oz) and 5/8 of a cup of brown rice (which is around 10 tablespoons).
Explanation:
You are given:
every serving of shrimp contains 2g of fat and 5mg of iron;
every serving of rice contains 6g of fat and 7mg of iron;
each meal should have 6g of total fat and 10mg of total iron.
You need to set a system of equation: let's call
s = quantity of shrimps
r = quantity of rice
The equation for the total fat will be: the quantity of fat in the serving of shrimps plus the quantity of fat in the serving of rice must be equal to 6g
2s + 6r = 6 (1)
Similarily:
the quantity of iron in the serving of shrimps plus the quantity of iron in the serving of rice must be equal to 10g
5s + 7r = 10 (2)
In order to solve the system, solve for s in equation (1):
s = (6-6r)/2 = 3 - 3r (3)
Substitute in equation (2):
5(3 - 3r) + 7r = 10
and solve for r:
15 - 15r + 7r = 10
8r = 5
r = 5/8
Substitute the value of r in equation (3):
s = 3 - 3×5/8 = 9/8
Therefore Adam would need 9/8 of a 5oz serving of shrimps and 5/8 of a 1 cup of brown rice for each meal.
I think it is 30.48 because i looked it up
You add the numerators and keep it over the denominator. 4/16 plus 12/16 is 16/16 and when the same number is the denominator and numerator at the same time, its 1
1
Answer:
1st plan--> 40+0.11x
2nd plan--> 49+0.09x
Dont know wat u want
Step-by-step explanation: