Answer:
7.5kg
Step-by-step explanation:
Given that:
Monday:
Mass of sand = 24 kg
Mass of cement = 5 kg
Tuesday :
Mass of sand = 36 kg
Let mass of cement = c
Mass of cement required to make the same type of mortar mix
Mass of Sand = mass of cement
24kg = 5kg
36kg = c
By cross multiplication :
24 * c = 5 * 36
24c = 180
Divide both sides by 24
c = 180 / 24
c = 7.5 kg
Hence mass of cement required is 7.5 kg
Amount of water in the pool at the end of the day is 5457798.7 gallons
<u>Explanation:</u>
Given:
Initial amount of water in the pool = 45,000 gallons
Increase in amount = 0.75 in per minute
Time, t = 1 day
t = 24 X 60 min
t = 1440 min
So,
Increase in amount of water in 1 day = 0.75 in X 1440
= 1080 in
Volume of 1080 in of water = (1080 in)³
Volume from cubic inch to gallon = 5453298.7 gallon
Amount of water in the pool at the end of the day = 45000 + 5453298.7 gallon
= 5457798.7 gallon
Answer:
(3, 3)
Step-by-step explanation:
The solution of such a system is the ordered pair that is a solution to both equations. To solve a system of linear equations graphically we graph both equations in the same coordinate system. The solution to the system will be in the point where the two lines intersect.
I'm not 100% sure, but I believe the answer would be:
D. For every additional adult at the park, the number of children increases by about 7.
P.S. good luck on the 6.10, fellow classmate!
I am going to assume ‘centimetre’ was a typo.
A^2 + B^2 = C^2
C^2 - A^2 = B^2
32 = B^2
Square root both sides
B = 5.7m high
The ladder will reach 5.7 meters high