Maggie pays $9.28 for 8m of ribbon.
what is the cost of the ribbon per meter
2 answers:
Answer: $1.16
Step-by-step explanation:
cost of ribbon per meter= cost/meter
$9.28/8m=$1.16/m
Answer:
$1.16 per meter
Step-by-step explanation:
You need to divide the coat by the meters.
9.28/8
= 1.16
So one meter of ribbon would cost $1.16.
You might be interested in
Answer:
-3, 5
Step-by-step explanation:
By solving for x you get -3 and 5.
Y=-1/2x+5 slope=-1/2 because it goes down one unit and to the right 2 units, and the y intercept is 5 because that's where the line intercepts the y-axis!
Answer:
6 nights with 4 logs left over
Answer:
I think choose (D)
2 bags = 4 feeders You need 40 feeders. 40 feeders (need to fill up) ÷ 4 (feeders per 2 bags) = 10 10 x 2 (bags) = 20 bags for 40 feeders