1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
TEA [102]
3 years ago
12

An instructor who taught two sections of engineering statistics last term, the first with 25 students and the second with 35, de

cided to assign a term project. After all projects had been turned in, the instructor randomly ordered them before grading. Consider the first 15 graded projects.
a. What is the probability that exactly 10 of these are from the second section? (Round your answer to four decimal places.)
b. What is the probability that at least 10 of these are from the second section? (Round your answer to four decimal places.)
c. What is the probability that at least 10 of these are from the same section? (Round your answer to four decimal places.)
d. What are the mean value and standard deviation of the number among these 15 that are from the second section? (Round your mean to the nearest whole number and your standard deviation to three decimal places.)
e. What are the mean value and standard deviation of the number of projects not among these first 15 that are from the second section? (Round your mean to the nearest whole number and your standard deviation to three decimal places.)
Mathematics
1 answer:
Amiraneli [1.4K]3 years ago
8 0

Answer:

a) P=0.1721

b) P=0.3528

c) P=0.3981

Step-by-step explanation:

This sampling can be modeled by a binominal distribution where p is the probability of a project to belong to the first section and q the probability of belonging to the second section.

a) In this case we have a sample size of n=15.

The value of p is p=25/(25+35)=0.4167 and q=1-0.4167=0.5833.

The probability of having exactly 10 projects for the second section is equal to having exactly 5 projects of the first section.

This probability can be calculated as:

P=\frac{n!}{(n-k)!k!}p^kq^{n-k}= \frac{15!}{(10)!5!}\cdot 0.4167^5\cdot0.5833^{10}=0.1721

b) To have at least 10 projects from the 2nd section, means we have at most 5 projects for the first section. In this case, we have to calculate the probability for k=0 (every project belongs to the 2nd section), k=1, k=2, k=3, k=4 and k=5.

We apply the same formula but as a sum:

P(k\leq5)=\sum_{k=0}^{5}\frac{n!}{(n-k)!k!}p^kq^{n-k}

Then we have:

P(k=0)=0.0003\\P(k=1)=0.0033\\P(k=2)=0.0165\\P(k=3)=0.0511\\P(k=4)=0.1095\\P(k=5)=0.1721\\\\P(k\leq5)=0.0003+0.0033+0.0165+0.0511+0.1095+0.1721=0.3528

c) In this case, we have the sum of the probability that k is equal or less than 5, and the probability tha k is 10 or more (10 or more projects belonging to the 1st section).

The first (k less or equal to 5) is already calculated.

We have to calculate for k equal to 10 or more.

P(k\geq10)=\sum_{k=10}^{15}\frac{n!}{(n-k)!k!}p^kq^{n-k}

Then we have

P(k=10)=0.0320\\P(k=11)=0.0104\\P(k=12)=0.0025\\P(k=13)=0.0004\\P(k=14)=0.0000\\P(k=15)=0.0000\\\\P(k\geq10)=0.032+0.0104+0.0025+0.0004+0+0=0.0453

The sum of the probabilities is

P(k\leq5)+P(k\geq10)=0.3528+0.0453=0.3981

You might be interested in
Need to find shaded area of figure please help!
devlian [24]

Answer:

39 ft^2

Step-by-step explanation:

Find the area of the triangle and subtract the area of the square.

area of triangle = bh/2

area of square = s^2

shaded area = bh/2 - s^2

shaded area = (20 ft)(16 ft)/2 - (11 ft)^2

shaded area = 160 ft^2 - 121 ft^2

shaded area = 39 ft^2

7 0
3 years ago
Rosario is rolling a six-sided number cube. Rosario rolls the number cube twice. What is the probability that Rosario gets the n
Marat540 [252]
It's a conditional probability

P( getting a given number AND getting again the same number)


P(of getting any number) =1/6
P(of getting once again the same number) 1/6 x 1/6 = 1/36
7 0
3 years ago
Read 2 more answers
Plz help!!! 40 points. The graph of a line relates the volume as measured in gallons with its approximate equivalent volume meas
Iteru [2.4K]

Ahh i hope im in time to help!

The answer is C, 46

Hope this helped pls mark be brainliest!!!

7 0
3 years ago
katelyn bought 5.68 pounds of peaches. the peaches were on sale for 1.49 a pound. how much did lately spend on peaches
Leya [2.2K]
So Katelyn bought 5.68 pounds of peaches. And one pound of peaches cost $1.49. So that would mean that we would have to multiply the pounds of peaches she bought, with how much each pound costs. 5.68 × 1.49 = ?

Once you multiply these two decimals, you would get 8.4632. So she spent $8.4632 on 5.68 pounds of peaches. You would multiply the two decimals to find how much she spent in all.
7 0
3 years ago
Read 2 more answers
A cheetah ran 300 feet in 2.92 seconds. What was the cheetah’s average speed in miles per hour? Show your work.
alexdok [17]

Answer:

about 70.0 mph

Step-by-step explanation:

speed = distance/time

(300 ft)/(2.92 s)·(1 mi)/(5280 ft)·(3600 s)/(1 h) = (300·3600/(2.92·5280)) mi/h

≈ 70.0498 mi/h

8 0
3 years ago
Other questions:
  • Which of the following lists of ordered pairs is a function?
    8·2 answers
  • Find how many quarts of 6% butterfat milk and 3% butterfat milk should be mixed to yield 60 quarts of 4% butterfat milk.
    5·1 answer
  • Please help me on this! Thank you!
    9·1 answer
  • HELP PLS<br><br> I'm having a lot of trouble on this question
    14·2 answers
  • Teresa is maintaining a camp fire. She can keep the fire burning for 444 hours with 666 logs. She wants to know how many logs (y
    9·2 answers
  • 9+1/2(7n-26)-8n simplify
    15·1 answer
  • A line includes the points (-3, -8) and (9, 4). What is its equation in slope-intercept form?
    5·1 answer
  • Farmers have learned how to grow watermelons
    15·1 answer
  • What is point-slope form means
    7·1 answer
  • Use a table to find two consecutive integers between which the solution lies.
    8·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!