1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
TEA [102]
3 years ago
12

An instructor who taught two sections of engineering statistics last term, the first with 25 students and the second with 35, de

cided to assign a term project. After all projects had been turned in, the instructor randomly ordered them before grading. Consider the first 15 graded projects.
a. What is the probability that exactly 10 of these are from the second section? (Round your answer to four decimal places.)
b. What is the probability that at least 10 of these are from the second section? (Round your answer to four decimal places.)
c. What is the probability that at least 10 of these are from the same section? (Round your answer to four decimal places.)
d. What are the mean value and standard deviation of the number among these 15 that are from the second section? (Round your mean to the nearest whole number and your standard deviation to three decimal places.)
e. What are the mean value and standard deviation of the number of projects not among these first 15 that are from the second section? (Round your mean to the nearest whole number and your standard deviation to three decimal places.)
Mathematics
1 answer:
Amiraneli [1.4K]3 years ago
8 0

Answer:

a) P=0.1721

b) P=0.3528

c) P=0.3981

Step-by-step explanation:

This sampling can be modeled by a binominal distribution where p is the probability of a project to belong to the first section and q the probability of belonging to the second section.

a) In this case we have a sample size of n=15.

The value of p is p=25/(25+35)=0.4167 and q=1-0.4167=0.5833.

The probability of having exactly 10 projects for the second section is equal to having exactly 5 projects of the first section.

This probability can be calculated as:

P=\frac{n!}{(n-k)!k!}p^kq^{n-k}= \frac{15!}{(10)!5!}\cdot 0.4167^5\cdot0.5833^{10}=0.1721

b) To have at least 10 projects from the 2nd section, means we have at most 5 projects for the first section. In this case, we have to calculate the probability for k=0 (every project belongs to the 2nd section), k=1, k=2, k=3, k=4 and k=5.

We apply the same formula but as a sum:

P(k\leq5)=\sum_{k=0}^{5}\frac{n!}{(n-k)!k!}p^kq^{n-k}

Then we have:

P(k=0)=0.0003\\P(k=1)=0.0033\\P(k=2)=0.0165\\P(k=3)=0.0511\\P(k=4)=0.1095\\P(k=5)=0.1721\\\\P(k\leq5)=0.0003+0.0033+0.0165+0.0511+0.1095+0.1721=0.3528

c) In this case, we have the sum of the probability that k is equal or less than 5, and the probability tha k is 10 or more (10 or more projects belonging to the 1st section).

The first (k less or equal to 5) is already calculated.

We have to calculate for k equal to 10 or more.

P(k\geq10)=\sum_{k=10}^{15}\frac{n!}{(n-k)!k!}p^kq^{n-k}

Then we have

P(k=10)=0.0320\\P(k=11)=0.0104\\P(k=12)=0.0025\\P(k=13)=0.0004\\P(k=14)=0.0000\\P(k=15)=0.0000\\\\P(k\geq10)=0.032+0.0104+0.0025+0.0004+0+0=0.0453

The sum of the probabilities is

P(k\leq5)+P(k\geq10)=0.3528+0.0453=0.3981

You might be interested in
What is the unknown fraction?
daser333 [38]

Answer:

A. 31/100

Step-by-step explanation:

Change 3/10 to hundreds:

3/10 × 10/10 = 30/100

The denominator (the bottom number) must be 100.

61 - 30 is 31.

The missing number is 31/100. See image.

4 0
2 years ago
Can anyone help me find the area of these two pls ?
Rasek [7]
13: 72.25
14: 52
For 14, you need to split the figure into a triangle and rectangle.
5 0
2 years ago
What is the equation in slope intercept form of a line with slope -4/3 and y-intercept -2
Marta_Voda [28]
Y=mx+b
m=slope
b=y-intercept

Given
Slope=-4/3
y-intercept=-2

Plug them into the slope intercept formula
Final answer: y=-4/3-2
6 0
4 years ago
PLZ HELP ME!!!! I NEED THE ANSWER QUICK SO IM GIVING BRAINLIEST TO THE FASTEST AND BEST ANSWER.
geniusboy [140]

Answer:

f(x) = 8(1/2)^x.

Step-by-step explanation:

According to the graph, there is a point at (0, 8) and (1, 4).

That means that when x = 0, y = 8.

8 = a(b)^0

1a = 8

a = 8

That means that a = 8, and when x = 1, y = 4.

4 = 8(b)^1

4 = 8b

8b = 4

b = 4/8

b = 1/2

So, f(x) = 8(1/2)^x.

Hope this helps!

8 0
4 years ago
The slope is 3/4 and they y-intercept is (0, 4​
Paha777 [63]

Answer:

eqn of line

3x-4y=-16

Step-by-step explanation:

6 0
3 years ago
Read 2 more answers
Other questions:
  • What does x equal ? This is similarity
    12·1 answer
  • The sum of three consecutive integers is 9. What is the equation that represents the scenario?
    13·2 answers
  • One week, Kerry travels 125 miles and uses 5 gallons of gasoline. The next week, she travels 175 miles and uses 7 gallons of gas
    11·2 answers
  • The bill for lunch at a restaurant was $30. The dinner added 20% tip. Which equation relates the tip, t, with the bill, b?
    11·2 answers
  • A hat is on sale for h dollars. The regular price is 7 times as much. Charlie has enough money to buy two hats at the regular pr
    11·1 answer
  • A pillar 4 feet tall casts a shadow 2 feet long on the ground. If the pillar was 14 feet tall, how many feet in length would the
    8·2 answers
  • If f(x) = x2 – 3x and<br> g(x) = 4x + 2, which of the following is equal<br> to f(g(3))?
    10·1 answer
  • What is the area of the square?
    12·1 answer
  • Evaluate (p‾√−3)+q ( p − 3 ) + q when p = 25 and q = 21.
    7·2 answers
  • Robin was just hired at Groceries &amp; More as a cashler. They pay her $12 an hour. She works 20 hours a week and is going to s
    14·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!