Anything with 4 sides is a quadrilateral like a rhombus square trapezoid and diamond
Your answer is 8,000 minus 6 & 4
Step-by-step explanation:
I used math
anyway
remember you can do anything to an equation as long as you do it to both sides
so
4n+2 and 1/2=2n+5
minus 2n both sides
4n-2n+2 and 1/2=2n-2n+5
2n+2 and 1/2=0+5
2n+2 and 1/2=5
minus 2 and 1/2 both sides
2n=2 and 1/2
divide both sides by 2
I mean times both sides by 1/2
n=1 and 1/4
answer is C
Time taken by Michelle to complete the work alone = 6 hours
Time taken by Nancy to complete the work alone = 3 hours
Now, when they both are working on the same job for 1 hour,
Amount of job completed = (1/6) + (1/3)
= (1 + 2)/6
= 3/6
= 1/2
So in 1 hours time they both will complete half of the job. Then in 2 hours Michelle and Nancy will complete the total job. I hope the answer has come to your help.
The first thing we have to do is to calculate the
midpoint of the min and max speeds. We are given that the min and max is 74 and
95 respectively. The midpoint is then calculated as (max+min) / 2. Therefore:
midpoint = (74 + 95) / 2 = 84.5
Next, we calculate the distance from the midpoint to the
endpoint by doing subtraction. Therefore:
min endpoint: 84.5 – 74 = 10.5
max endpoint: 95 – 84.5 = 10.5
Now we know that v minus the midpoint will equal the
distance such that:
| v - midpoint | = distance.
To our problem,
| v – 84.5 | = 10.5