To graph the absolute value graph the function y=f(x). Anything above the x- axis, stays above it.
625,087,435
600,000,000 + 20,000,000 + 5,000,000 + 80,000 + 7,000 + 400 + 30 + 5
How much part can sally paint in an hour ?
a ÷ 7 = a/7
And what about Steve ?
a ÷ 9 = a/9
Where, a is the total area of the room.
So, let the time taken by both of them to paint the room together be 't'
So,
t(a/7 + a/9) = a
t(9a/63 + 7a/63) = a
t(16a/63) = a
t = 63/16 ≈ 4 hr
The answer is 280,000 rounded to the nearest ten thousand.