Answer:
40 minutes
Step-by-step explanation:
We have a load and a discharge, given by a speed that would be a barrel / minute.
Which means that the loading rate is: 1/20
And the discharge rate: 1/40
Since they are contrary, the result would be the subtraction between these two rates:
1/20 - 1/40 = 1 / x
1 / x = 0.025
x = 1 / 0.025
x = 40
Which means it will take 40 minutes to fill under the mentioned conditions
Answer:
P(green) =1/4
P(orange)=1/2
Step-by-step explanation:
I'm assuming this is probability but it\s been a while, so i'm not sure
number one is a square being divided into half and then one half is being divided into quarters. (as shown by the dotted lines and right angle)
so the probablity of landing in green is 1/4, because it is one fourth of the square.
the probability of the orange is 1/2 because it is 1/2 of the square
The same logic would apply to the "circle" i can see in the next problem. 120 degrees is 1/3 of 360, 90 is 1/4, and so on.
Hope that helps.
Answer:
The rectangle with 5 and 4
The triangle with 10 and 4
Brainliest pls :)
Answer:
-3/2
Step-by-step explanation:
We can find the slope between two points using
m = (y2-y1)/(x2-x1)
= (-7 - -1)/(5 - 1)
(-7+1(/(5-1)
-6/4
-3/2