Answer:
Option (d) 2 min/veh
Explanation:
Data provided in the question:
Average time required = 60 seconds
Therefore,
The maximum capacity that can be accommodated on the system, μ = 60 veh/hr
Average Arrival rate, λ = 30 vehicles per hour
Now,
The average time spent by the vehicle is given as
⇒ 
thus,
on substituting the respective values, we get
Average time spent by the vehicle = 
or
Average time spent by the vehicle = 
or
Average time spent by the vehicle = 
or
Average time spent by the vehicle =
hr/veh
or
Average time spent by the vehicle =
min/veh
[ 1 hour = 60 minutes]
thus,
Average time spent by the vehicle = 2 min/veh
Hence,
Option (d) 2 min/veh
True
the answer to this would be true
Answer:
A. Forces that act perpendicular to the surface and pull an object apart exert a tensile stress on the object.
Explanation:
Tensile stress is referred as a deforming force, in which force acts perpendicular to the surface and pull an object apart, attempting to elongate it.
The tensile stress is a type of normal stress, in which a perpendicular force creates the stress to an object’s surface.
Hence, the correct option is "A."
Answer:
True
Explanation:
The tensile forces are small in most arches and usually negligible.