1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
I am Lyosha [343]
3 years ago
15

Does anyone know the answer to this question? −9y>9

Mathematics
2 answers:
Kaylis [27]3 years ago
5 0

y<−1

hope this helps:)

TiliK225 [7]3 years ago
4 0

Answer:

y<-1

Step-by-step explanation:

1) Multiply both sides by -1 and flip the inequality sign from > to <

  (-9y)(-1) < 9(-1)

2) Simplify

    9y < -9

3) Divide both sides by 9

    \frac{9y}{9}

4) Solve

   The 9's cancel out for \frac{9y}{9} leaving y

   \frac{-9}{9}=1

So the answer is y < -1

You might be interested in
Determine whether the statement is always, sometimes, or never true: Two points A and B determine a line. *
alisha [4.7K]

Answer:

sometimes

Step-by-step explanation:

8 0
3 years ago
Which one is proportional? Im a little confused lol
Kobotan [32]
Answer:

y = x + 4





——————-
4 0
2 years ago
mauricio estimates that the first module of the project could be completed in as few as 15 days or could take as many as 25 days
4vir4ik [10]

Answer:

<em>Most likely time, </em>according to PERT (Program evaluation and review technique).

Step-by-step explanation:

PERT is "a statistical tool used in <em>project management" (Program evaluation and review technique (2020), </em>in Wikipedia), and it is commonly used with CPM <em>(Critical Path Method)</em> to manage projects.

Inside PERT, there are different defined times to accomplished an activity in a project, that is:

  • An <em>optimistic time</em> or minimum time required to accomplished an activity, i.e., if everything goes better than normal, the activity is accomplished before expected.
  • A <em>pessimistic time, </em>a time quite the opposite to optimistic time.
  • A <em>most likely time</em>, or a time required to accomplished an activity if everything goes as expected or normally.
  • An <em>expected time</em>, an statistical estimation.

Considering the question, we have that the <em>time</em> when "the first module of the project could be completed":

  • "[...] in as few as 15 days"  is the <em>optimistic time</em>.
  • "[...] or could take as many as 25 days" is the <em>pessimistic time</em>.
  • "[...] but most likely will require 20 days" is the <em>most likely time</em>.

As a result, the <em>20-day estimate</em> is called the <em>most likely time</em> in the context of the PERT/CPM techniques.

3 0
3 years ago
What is the range of the relation {(2, 4), (3, 4), (4, 7), (5, 7), (6, 5)}?
Leto [7]
4,7,5 .................................................
6 0
3 years ago
Read 2 more answers
What is 19.3 rounded to the nearest whole number
Vesnalui [34]
19.......................................
6 0
3 years ago
Read 2 more answers
Other questions:
  • Monica reads 71/2 pages of a book in 9 minutes. What is her average reading rate in pages per min
    13·1 answer
  • How many centigrams are there in 24 grams?
    15·1 answer
  • How much is 2/3 cups plus 1 1/4 cups
    12·1 answer
  • If the equation of a line is y= - 2/3 x - 2 at what.point on the graph would I find the y- intercept?
    10·2 answers
  • Solve the system of equations 7x+10y=36 y=2x+9
    12·1 answer
  • Please solve for x!!!!
    9·1 answer
  • PLEASE HELP what is the solution to |2x-8|&lt;2
    14·2 answers
  • Find the area of the trapezoid. Leave your answer in simplest radical form
    15·1 answer
  • Perform the
    15·1 answer
  • The degree of the polynomial function f(x) is 4.The roots of the equation f(x)=0 are −6, −2, 1, and 3.Which graph could be the g
    11·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!