A statement which isn't true is that: B. we can find the Thevenin resistance for any circuit by zeroing all sources and finding the equivalent resistance of the resulting network.
<h3>The true statements about these theorems.</h3>
In Electrical engineering, the true statements about Thevenin's theorem and Norton's theorem include the following:
- The Thevenin voltage is generally equal to the open circuit voltage.
- We can do a source transformation to switch between Thevenin and Norton equivalent circuits.
- The Norton current is the same as the short-circuit current.
- The Thevenin resistance is the same as the Norton resistance.
In this context, we can infer and logically deduce that we cannot find the Thevenin resistance for an electrical circuit by zeroing all sources and finding the equivalent resistance of the resulting network.
Read more on Thevenin's theorem here: brainly.com/question/28007778
#SPJ1
Answer:
True Position using features of size (MMC/LMC)
Explanation:
True Position using features of size (MMC/LMC)
However, with true position you can make the tolerance referenced to several datum's as opposed to just one with axis perpendicularity. When you callout true position using datums on the face, and sides of the part – perpendicularity is controlled as well.
Surface: Perpendicularity is measured using a height gauge, similar to flatness, however, the gauge (or part) is locked to a 90° datum to measure how perpendicular the surface is. The entire surface has to be measured if it is a flat feature.
If the tolerance is preceded by a diameter symbol (⌀), the tolerance is a diameter or cylindrical shaped zone, as in the position of a hole. If there is no symbol preceding the tolerance, the default tolerance zone shape is parallel planes or a total wide zone, as in the position of a slot or profile of a surface.
Answer:
c) site preparation
Explanation:
A construction process can be defined as a series of important physical events (processes) that must be accomplished during the execution of a construction project.
Generally, in the construction of any physical asset such as offices, hospitals, schools, stadiums etc, the first step of the construction process is site preparation. Site preparation refers to processes such as clearing, blasting, levelling, landfilling, surveying, cutting, excavating and demolition of all unwanted objects on a piece of land, so as to make it ready for use.
This ultimately implies that, site preparation should be the first task to be accomplished in the construction process.
Hence, the construction process typically begins with site preparation before other activities such as the laying of foundation can be done.
Additionally, construction costs can be defined as the overall costs associated with the development of a built asset, project or property. The construction costs is classified into two (2) main categories and these are; capital and operational costs.
Based on the percent moisture content of the dried product, the mass of dried casein produced os 852.3 kg.
<h3>What is the mass of casein in wet casein?</h3>
The mass of casein in 1000 Kg of wet casein is 75% 1000 kg = 750 Kg
Mass of water 250 kg
The mass of casein is constant while the moisture content can be changed.
At 12% moisture content;
750 kg = 88%%
100 % = 100 ×750/88 = 852.27 kg
Therefore, the mass of dried casein produced os 852.3 kg.
Learn more about mass at: brainly.com/question/24658038
#SPJ1