Answer:

Step-by-step explanation:
Point slope form:

<em>Note: </em>
- <em>m represents the slope</em>
- <em>(x1,y1) represents the coordinate point</em>
Our answer would be 
The power increases by 21% per hour. 21% written as a decimal is 0.21.
Because it increases you would multiply the starting value by 1.21 times the number of hours (t).
That needs to be less than or equal to 100,00
The equation would be:
C: 15,040(1.21)t ≤ 100,000
Answer:
The correct answer is option 'a' : 120 is more than 2.5 standard deviations above the expected value.
Step-by-step explanation:
For an exponential distribution we have
The expected value μ = 80
No of trails n = 200
Thus we have

The deviation is related to expected value and probability as

Thus the values between the given deviation is

Now since 120 successes are out of the range of [62.75,97.25] thus 120 is more than the expected value.
Answer:

Step-by-step explanation:
If x varies directly as the product of p and m, and inversely with y, the relation can be written ...
x = k(pm)/y . . . . where k is the constant of proportionality
__
This can be solved for k:
k = xy/pm
For the given values, the value of k is ...
k = (2)(4)/((0.5)(2)) = 8
Then the relation between the variables can be written ...
(xy)/(pm) = 8