Answer:
Rs. 333
Step-by-step explanation:
Area of the surface of the cuboidal box to be painted = surface area of the cuboidal box - area of the base
✔️Surface area of the cuboidal box = 2(L*W + W*H + L*H)
L = 6 cm
W = 4 cm
H = 2.5 cm
Surface area of the cuboidal box = 2(6*4 + 4*2.5 + 6*2.5) = 2(24 + 10 + 15) = 2(49)
Surface area of cuboidal box = 98 cm²
✔️Area of base = L*W
= 6*4 = 24 cm²
Area of the cuboidal box to be painted = 98 - 24 = 74 cm²
✔️Cost of painting 74 cm² at Rs. 4.50 per cm² = 74 × 4.50 = Rs. 333
Answer:
6.7%
Step-by-step explanation:
In this question, we are to calculate the percentage error in in the average polling results calculated.
Firstly, what this means is that we calculate the average of the total votes.
That would be ; (66 + 56 + 55 + 60 + 63)/5 =
300/5 = 60%
we now proceed to calculate the percentage error in the company’s result.
Mathematically;
percentage error = (Actual value - expected value)/expected value * 100%
Here the actual value is 64% and the expected is 60%
% error = (64-60)/60 * 100 = 4/60 * 100 = 6.67%
This is 6.7% to the nearest tenth of a percent
Answer:
Step-by-step explanation:
1200
-23.2 I think this is the answer
Answer:
give me brainllest if right
1123.2
Step-by-step explanation: