Answer:
a.$6,705
Explanation:
The total cost is the sum of the three cost component, Direct materials, direct labours, and factory overhead.
Direct Labor Cost: 71 hours x $15 per hour = $ 1,065
Manufacturing Overhead: 175 machine hours x $14 per hour = $ 2,450
Direct Materials $ 3,190
Total cost: 1,065 + 2,450 + 3,190 = 6,705
Answer:
0.079
Explanation:
Price elasticity of demand using midpoint formula can be calculated as follows
Formula
Elasticity of demand = (change in quantity/average quantity)/(change in price/average price)
Calculation
Elasticity of demand = (600/10,900)/(-2.1/3.05)
Elasticity of demand =-0.055 / -0.688
Elasticity of demand =-0.079
working
Change in price (2-4.1) = -2.1
Average price (2+4.1)/2=3.05
Change in quantity (11,200-10600) = 600
average quantity (11,200+10,600)/2 = 10,900
The elasticity of demand is inelastic as the elasticity is below 1.
Answer:
W = $27.34
Explanation:
Given data:
Percentage Decline in average income is = 2%
CPI in 1990 1.30
CPI in 2000 is 1.69
Average nominal wage is 2000 is $35
Inflation rate is given as
Inflation rate = % Change in CPI
= (1.69 / 1.3) - 1
= 1.3 - 1 = 0.3 = 30%
Real wage = Nominal wage / Price level, hence
Percentage change in real wage = % Change in (nominal wage - inflation rate)
-2% = % Change in nominal wage - 30%
% Change in nominal wage = 28%
let nominal wage in 1990 is w
W\times 1.28% = $35
solving for W = $27.34
Answer:
A. Tactical Planning
Explanation:
Tactical planning is a type of an organization's strategic plan used in achieving a specific goal. It's used after an organization outlines a strategic plans indicating general organizational goals and objectives. Tactical plans usually describes the methodology to be used in achieving each of those general goals in the strategic plan. It is done in order to achieve long term goals. Therefore, for Deutsche bank to be able to implement their long range plan, they need to employ the use of tactical planning.