1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
frutty [35]
3 years ago
10

How do you graph Y=-5x+15

Mathematics
1 answer:
Alenkasestr [34]3 years ago
3 0
You plot the first point on the y-axis at 15 units up. Then you follow the direction of the slope.

The slope is: -5/1

So from your first point on the y-axis, go down 5 units and to the right 1 unit. Do this multiple times after you plot your new point. After this you may draw a line with an arrow to connect the dots.
You might be interested in
Find the value of x <br><br> a. 7.5<br> b. 6<br> c. 10<br> d. 8
Radda [10]
B.6 because the length is equal to the length of the other 6
7 0
3 years ago
Find the measure of HG¯¯¯¯¯¯¯¯.<br> A. 12<br> B. 16<br> C. 14<br> D. 7
Paraphin [41]

HG^2 = FG * (FG + EF)

Fill in the values:

(x+3)^2 = x * (7+x)

Simplify the right side:

(x+3)^2 = 7x +x^2

Rewrite the left side using the FOIL method

x^2 + 6x + 9 = 7x +x^2

Subtract x^2 from both sides:

6x +9 = 7x

Subtract 6x from both sides:

x = 9

Now you have x solve for HG

HG = x +3 = 9+3 = 12

The answer is A.

3 0
3 years ago
Please answer correctly !!!!!! Will mark brainliest answer !!!!!!!!!!
Rasek [7]

Answer:

see below

Step-by-step explanation:

1. 0 = (r + 1)(r + 8)

Using Zero Product Property, r = -1, r = -8

2. h(r) = (r + 1)(r + 8)

         = r² + 9r + 8

         = (r + 9/2)² - 81/4 + 8

         = (r + 4.5)² - 12.25 (Complete the square)

   Vertex: (-4.5, -12.25)

5 0
3 years ago
What is the value of 8 in the number 8000
Free_Kalibri [48]

Answer: 8000

Step-by-step explanation:

6 0
3 years ago
Suppose compact fluorescent light bulbs last, on average, 11,500 hours. The distribution is normal and the standard deviation is
juin [17]

Answer:

2.275%

Step-by-step explanation:

The first thing to do here is to calculate the z-score

Mathematically;

z-score = (x-mean)/SD

from the question, x = 12,300 hours , mean = 11,500 hours while Standard deviation(SD) = 400 hours

Plugging the values we have;

z-score = (12,300-11,500)/400 = 800/400 = 2

Now, we want to calculate P(z ≤ 2)

This is so because we are calculating within a particular value

To calculate this, we use the z-score table.

Mathematically;

P(z ≤ 2) = 1 - P(z > 2) = 1 - 0.97725 = 0.02275

To percentage = 2.275%

6 0
3 years ago
Other questions:
  • Alexi thinks of a number. he multiplies his number by 10 and then divides the answer by 100. he then multiples this answer by 10
    7·2 answers
  • Which statement is true?
    8·1 answer
  • A scooter travels 12 5 miles in a quarter hour<br>A.18<br>B.50<br>C.24<br>D.12.50<br>​
    15·1 answer
  • ∠1 and ​ ∠2 ​ are vertical angles. ∠2 ​ has a measure of 31°. What is the measure of ​ ∠1 ​? Enter your answer in the box. °
    12·2 answers
  • Order of operation for (-6) (4) (-2)
    9·2 answers
  • Write an expression that represents the total number of cars sold during the first half of the year Cars sold : 5, 5, 6, 6, 7, 8
    9·1 answer
  • Find the zeros of the function.
    11·1 answer
  • Stephanie is 62 inches tall. Her brother is t inches shorter than she is.
    12·1 answer
  • The length and breadth of a rectangle are in the ratio 3 : 1. If the breadth is 7 cm,
    14·2 answers
  • Find the slope and y-intercept for x + 3y=3
    12·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!