Answer:
52
Step-by-step explanation:
AB is the hypotenuse of the right triangle
sin34 = opp/hyp = 29/hyp
hyp = 29/sin34 = 51.860457849...
I think if you do 9.00 + 9.00 to get 18.00 then do 17.00 + 17.00 to get 34.00 then do 41.00 + 41.00 to get 82.00 your answer will be 18.00+34.00+82.00= 134 so that’s your answer. Pls make me the brainliest
Answer:
The final answers are x = 1 OR x = -3.
Step-by-step explanation:
Given the equation is x^2 -3 = -2x
Rewriting it in quadratic form as:- x^2 +2x -3 = 0.
a = 1, b = 2, c = -3.
Using Quadratic formula as follows:- x = ( -b ± √(b² -4ac) ) / (2a)
x = ( -2 ± √(4 -4*1*-3) ) / (2*1)
x = ( -2 ± √(4 +12) ) / (2)
x = ( -2 ± √(16) ) / (2)
x = ( -2 ± 4 ) / (2)
x = (-2+4) / (2) OR x = (-2-4) / (2)
x = 2/2 OR x = -6/2
x = 1 OR x = -3
Hence, final answers are x = 1 OR x = -3.
Answer: 14 minutes
Step-by-step explanation:
in the attachment
Answer:
p(on schedule) ≈ 0.7755
Step-by-step explanation:
A suitable probability calculator can show you this answer.
_____
The z-values corresponding to the build time limits are ...
z = (37.5 -45)/6.75 ≈ -1.1111
z = (54 -45)/6.75 ≈ 1.3333
You can look these up in a suitable CDF table and find the difference between the values you find. That will be about ...
0.90879 -0.13326 = 0.77553
The probability assembly will stay on schedule is about 78%.