1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
pogonyaev
3 years ago
15

A rhino can run at speeds of about 28 miles per hour. What is that speed in feet per second, to the nearest whole number?

Mathematics
2 answers:
trapecia [35]3 years ago
5 0

Answer:

The speed of a rhino is 41 feet/second.

Step-by-step explanation:

A rhino can run at speed of about 28 miles per hour.

In one hour  a rhino can run = 28 miles

As we know 1 hour = 3600 seconds

1 mile = 5280 feet

28 miles = 5280 × 28 = 147,840 feet

Therefore, we can say in 3600 seconds a rhino can run = 147,840 miles

So the speed per second = \frac{147840}{3600} = 41.06 ≈ 41 feet

The speed of a rhino is 41 feet/second.

mash [69]3 years ago
4 0

28 mph is approximately 41.0666... fps.

This is because 1mph is approximately 1.4666... fps.

You might be interested in
Volume of a cube is 1728 cm3.Find its surface area​
Leno4ka [110]

Answer:

<h2>a=V⅓=1728⅓≈12</h2><h2 />

Step-by-step explanation:

<h2>Using the formula</h2><h2>V=a3</h2>

<h2>it is right answer </h2><h3>hope it will help you </h3>
8 0
3 years ago
Using the weighted average approach to process costing, floridyne would use what number of equivalent units in 2019 to calculate
timofeeve [1]

Floridyne would use an equivalent unit labor of 166,340 unit to calculate the cost per equivalent unit for direct labor.

<h3>How do we get the equivalent unit labor?</h3>

Under weighted average, we do not make distinction between started and finished and just finished. Thus we work with finished and ending WIP only:

Finished         162,000

Ending - WIP    6,200 ending at 70% complete

Equivalent units for labor = Finished + Percentage of completion ending units

= 162,000 + 6,200 x 70%

= 166,340

Therefore, he would use an equivalent unit labor of 166,340 unit to calculate the cost per equivalent unit for direct labor.

Missing word "Floridyne, Inc. manufactures mouthwash. They had no finished goods inventory at the beginning of 2019. They have only one processing department for this product. A review of the company’s inventory records shows the following: At the beginning of January 2019, Floridyne has 4,500 gallons of mouthwash in process. (costs $8,410 for materials, 1,663 for labor and 4,990 for overhead) During 2019, Floridyne finishes/transfers 162,000 gallons of mouthwash. On December 31, 2019, Floridyne has 6,200 gallons of mouthwash that is 70% complete. Direct materials are added half at the beginning of the process and half after the process is 60% complete. During 2019 $349,000 of direct materials and $92,500 of direct labor were added. Using the weighted average approach to process costing,"

Read more about equivalent unit labor

brainly.com/question/14244838

#SPJ4

4 0
2 years ago
Suppose that the exchange rate from U.S. dollars to Canadian dollar is 1 U.S. dollar per 1.0028 Canadian dollars. Joey exchanges
Svetradugi [14.3K]

Answer:

373,952 dollars

Step-by-step explanation:

375/1,0028

4 0
3 years ago
Which equation matches the function shown in the graph?
borishaifa [10]

Answer:

its c ! just took the test :)

5 0
3 years ago
Kylie is comparing the cost of two housekeeping companies, DoItRight and CleanIt. The table describes the costs for DoItRight.
abruzzese [7]

Answer:

<u>First, find the cost function of DoItRight Housekeeping:</u>

  • Slope(m) = cost per hour = \frac{y_{2}-y_{1}}{x_{2}-x_{1}}=\frac{44-26}{3-1.5}=\frac{18}{1.5}=12

<em>The y-intercept(b), representing the initial cost, can be calculated by substituting in values to the function:</em>

f(x)=12x+b\\26=12(1.5)+b\\b=26-18=8

<u>Therefore, the function for two companies are:</u>

  • The function for DoItRight is f(x)=12x+8
  • The function for CleanIt is g(x)=10x+16

When comparing the two functions, it's shown how CleanIt has a greater y-intercept than DoltRight, meaning that CleanIt has a greater initial cost than DotRight. The y-intercept is when the graph intercepts the y-axis, therefore, the coordinates there would be (0, y-value), which, in this case for CleanIt company, will be (0, 16). While CleanIt has a greater y-intercept(initial cost), DoItRight has a greater slope, meaning they cost more per hour.

7 0
3 years ago
Other questions:
  • Find the unknown length of x
    12·1 answer
  • I need help with the Coordinate plane's
    14·1 answer
  • Describe in your own words "closed operations.
    11·2 answers
  • Can someone please answer this question please answer it correctly
    15·2 answers
  • This website is useless dont get any type of answers
    10·1 answer
  • At an university 70% of the students who attend stay on campus. If 1,380 of the students who attend live off campus, what is the
    6·1 answer
  • Find the slope of the line that contains the points (6, 5) and (8,7)
    13·1 answer
  • What is the answer to this?
    13·1 answer
  • What is the angle for the question mark of each question?
    14·1 answer
  • Find the graphed solution to the inequality. 3(x-9) &lt; -18<br><br> Closed or open, left or right?
    9·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!