Answer:
A handyman need 34 rows of 18 tiles.
How many total tiles does he need?
lets start off by saying that each row has 18 tiles
and there are supposed to be 34 rows
so you can multiply the number of tiles in each row (18) by the number of rows (34)
34 x 18 = 612
the handyman needs a total of 612 tiles to cover the floor.
plz hit the thx button and plz mark me brainliest if this helped :)
Answer:
Step-by-step explanation: Use the two points that are given to you and substitute them into the slope formula to find the answer.
m=<u><em>y2-y1/x2-x1</em></u>
m=9-5/3-1
m=4/2
Simplify the answer.
m=4/2
m=2/1
Final answer is 2.
The slope is positive meaning it is ascending (going up).
<u><em>Hope this helps!</em></u>
The statement is expressed algebraically as
(x/43) - 87 = -75
The formula for an area of a circle is A= pi(r)^2
so if you plug in 5 to r (because it’s the radius) you should get A= 78.5
The 99 percent confidence interval for the true mean length of the bolt is CI = (2.8712, 3.1288)
<h3>How to find the confidence interval?</h3>
Confidence Interval is used to tell us the degree of certainty or uncertainty that is existent in a sampling method.
The general formula for confidence interval is;
CI = x' ± z(s/√n)
where;
x' is sample mean
z is z-score at confidence level
s is sample standard deviation
n is sample size
We are given;
sample size; n = 36
Sample mean; x' = 3 inches
standard deviation; s = 0.3 inches
confidence level = 99%
z at 99% CL = 2.576
Thus;
CI = 3 ± 2.576(0.3/√36)
CI = 3 ± 0.1288
CI = (2.8712, 3.1288)
Read more about Confidence Interval at; brainly.com/question/17097944
#SPJ1