*see attachment for the figure referred to
Answer/Step-by-step explanation:
1. PN = 29
MN = 13
PM = ?
(Segment addition postulate)
(subtract MN from each side)
(substitute)


2. PN = 34, MN = 19, PM = ?
(sediment addition postulate)
(subtract MN from each side)
(substitute)


3. PM = 19, MN = 23, PN = ?
(Segment addition postulate)
(substitute)

4. MN = 82, PN = 105, PM = ?
(segment addition postulate)
(subtract MN from each side)
(substitute)


5. PM = 100, MN = 100, PN = ?
(Segment addition postulate)
(substitute)

Answer: ($3.055, $3.205)
Step-by-step explanation:
Given : Significance level : 
Critical value : 
Sample size : n= 36
Sample mean : 
Standard deviation : 
The confidence interval for population mean is given by :_


Hence, the 95% confidence interval to estimate the population mean = ($3.055, $3.205)
300 represents the initial value or the value that you started with.
1.15 is the rate that the function increases by over t (time)
Well 106 divided by 7 is 15 so 15 times 7 is 106
Answer:
8000
Step-by-step explanation: