That point would be : (2.5,5)
The missing step 2 should be;
The quantity of the sum of thirty six plus two divided by 0.5 − 14.8 ÷ 8
The missing step 6 would be that; 76 - 1.85
<h3>How to Solve Mathematical Order of Operations?</h3>
We want to know the steps to solving the expression the quantity of the sum of six squared plus two divided by the absolute value of negative 0.5 − 14.8 ÷ 8
This can be expressed as;
6² + 2 ÷ |-0.5| - 14.8 ÷ 8
Thus, the next step which is step 2 should be;
The quantity of the sum of thirty six plus two divided by 0.5 − 14.8 ÷ 8
The missing step 6 would be that;
76 - 1.85
Read more about Order of Operations at; brainly.com/question/27529825
#SPJ1
Answer:
45 feet
Step-by-step explanation:
To find the width of the model, we need to find the scale of the model to the actual tower.
Since we know the height of both towers, we can use that as the basis.
24 inches : 60 feet
12 inches : 30 feet
6 inches : 15 feet
So the width of the tower is 18 inches wide.
18 inches will then be equal to 12 + 7 inches : 30 + 15 feet
18 inches : 45 feet
Answer:
5cm
- The pencil is 5cm long.
The predicted value of hardness at 37 hours is 243.87 and an 85% confidence interval for the mean hardness is (242.12, 245.61). At 41 hours, the predicted hardness is 252 and an 85% confidence interval for mean hardness is (249.83, 254.18). The confidence interval for X is equals to 41 which is wider because the value 41 is farther away from the sample mean X than is 37. As an outcome, the standard error for the prediction is larger.