Answer: ε₁+ε₂+ε₃ = 0
Explanation: Considering the initial and final volume to be constant which gives rise to the relation:-
l₀l₀l₀=l₁l₂l₃

taking natural log on both sides

Considering the logarithmic Laws of division and multiplication :
ln(AB) = ln(A)+ln(B)
ln(A/B) = ln(A)-ln(B)

Use the image attached to see the definition of true strain defined as
ln(l1/1o)= ε₁
which then proves that ε₁+ε₂+ε₃ = 0
Explanation:
A schematic diagram is a picture that represents the components of a process, device, or other object using abstract, often standardized symbols and lines. ... Schematic diagrams do not include details that are not necessary for comprehending the information that the diagram was intended to convey.
Answer:
a) 28 stations
b) Rp = 21.43
E = 0.5
Explanation:
Given:
Average downtime per occurrence = 5.0 min
Probability that leads to downtime, d= 0.01
Total work time, Tc = 39.2 min
a) For the optimum number of stations on the line that will maximize production rate.
Maximizing Rp =minimizing Tp
Tp = Tc + Ftd
At minimum pt. = 0, we have:
dTp/dn = 0
Solving for n²:
The optimum number of stations on the line that will maximize production rate is 28 stations.
b)
Tp = 1.4 +1.4 = 2.8
The production rate, Rp =
The proportion uptime,
Answer:
The answer is "+9.05 kw"
Explanation:
In the given question some information is missing which can be given in the following attachment.
The solution to this question can be defined as follows:
let assume that flow is from 1 to 2 then
Q= 1kw
m=0.1 kg/s
From the steady flow energy equation is:
![m\{n_1+ \frac{v^2_1}{z}+ gz_1 \}+Q= m \{h_2+ \frac{v^2_2}{2}+ gz_2\}+w\\\\\ change \ energy\\\\0.1[1.005 \times 800]-1= 0.01[1.005\times 700]+w\\\\w= +9.05 \ kw\\\\](https://tex.z-dn.net/?f=m%5C%7Bn_1%2B%20%5Cfrac%7Bv%5E2_1%7D%7Bz%7D%2B%20gz_1%20%5C%7D%2BQ%3D%20m%20%5C%7Bh_2%2B%20%5Cfrac%7Bv%5E2_2%7D%7B2%7D%2B%20gz_2%5C%7D%2Bw%5C%5C%5C%5C%5C%20change%20%5C%20energy%5C%5C%5C%5C0.1%5B1.005%20%5Ctimes%20800%5D-1%3D%200.01%5B1.005%5Ctimes%20700%5D%2Bw%5C%5C%5C%5Cw%3D%20%2B9.05%20%5C%20kw%5C%5C%5C%5C)
If the sign of the work performed is positive, it means the work is done on the surrounding so, that the expected direction of the flow is right.