Answer:
1.00434
Step-by-step explanation:
Given the following :
Given a normal distribution ;
Mean (m) = 1.0 liter
Standard deviation (σ) = 0.01 liter
Sample size (n) = 25
For 97% sample means (sm) = 0.97
Z = (m - sm) / s
Zcrit = 1 - (100% - 97%)/2
Zcrit = 1 - (0.03/2)
Zcrit = 1 - 0.015 = 0.985
The z score which corresponds to 0.985 = 2.17
Upper limit : m + z*(σ/√n)
Upper limit : 1.0 + 2.17*(0.01/√25)
Upper limit : 1. 0 + 2.17*(0.01/5)
= 1.0 + 2.17*0.002
= 1.0 + 0.00434
= 1.00434
Answer:
$18,630
Step-by-step explanation:
The cost of every college is expected to increase 3.5% next year.
The cost to attend Westish College is currently $18000.
What is the expected cost to attend Westish College next year?
The increase in the cost for next year is calculated as:
3.5 % × Current cost
= 3.5% × $18,000
= $630.
The expected cost to attend Westish college next year=
$18,000 + $630
= $18,630
3/4 is the answer for your question
Answer:
b
Step-by-step explanation:
Each room has 2 walls that are 4x10 = 40 square feet and 2 walls that are 8x10 = 80 square feet. So 80+80+40+40 = 240 square feet of wall will be painted per room.
We use 2 coats of paint so in effect, we double the area. Imagine laying one thin wall on top of the other. The amount of paint area used per room doubles from 240 to 480
There are 4 of these rooms so 4*480 = 1920
The total area we need to paint is 1920 square feet
Divide this over 32 to get 1920/32 = 60
Final Answer: 60