The work done if the forklift is operating at full capacity is 11,900 J.
We have to recall that power is defined as the rate of doing work. The rate of doing work is defined as;
Power = Work done/time taken
When;
Power = 4950 W
Time taken = 2.40 s
Work done = Power × time taken
Work done = 4950 W × 2.40 s
Work done = 11,900 J
Learn more about work done: brainly.com/question/3902440
Answer:
3. 560W
Explanation:
First we calculate the work required for the 700N weigh student to climb up by 8 meters. Work is force times distance
W = Fs = 700 * 8 = 5600J
The average power is defined as the rate of energy expended over a unit of time. In order words, work divided by time duration
P = W/t = 5600 / 10 = 560 W
Answer: C. 1.4 10-11 N up
Explanation:
The magnetic force, F on a charge q moving with velocity v in a magnetic field B at an angle θ is given by:
F = q v B sin θ
Charge of proton, q = 1.6 × 10⁻¹⁹ C
Strength of magnetic field, B = 3.4 T pointing outwards
velocity of the proton, v = 2.5 × 10⁷ m/s towards left
Magnetic force is given by:
F = 1.6 × 10⁻¹⁹ C× 2.5 × 10⁷ m/s ×3.4 T× sin 90 = 13.6 × 10⁻¹² N = 1.4 × 10⁻¹¹ N up
The direction of the force is given by Lorentz Right hand rule. The fingers point magnetic field, the thumb points towards velocity, then the force on the proton is given by the direction perpendicular to the palm.
The magnetic field acts outwards with velocity of the proton towards left. The force would act perpendicular to the two -upwards.
wavelength =wavevelocity
--——————
Frequency
Frequency = 1/T => 1 / 6.73 = 0.1486
Wave velocity = L/T => 3.75 / 6.73 = 0.5572
Therefore, wave length = 0.5572/0.1486 = 3.75m
A charged particle has an electrostatic field surrounding it.
When the particle is in motion, the moving charge is an
electric current, and that has a magnetic field around it.