Answer:
The Prime Factorization of 80 is, 2 × 4 × 10, 2 × 2 × 2 × 2 × 5 and 2 × 4 × 10
Step-by-step explanation: They are correct, because they all equal 80. 2 × 4 × 10=80 and 2 × 4 × 10=80, and 2 × 2 × 2 × 2 × 5=80.
24 × 5=120, Therefore it's the only incorrect question.
Answer:
P = 17
General Formulas and Concepts:
<u>Pre-Algebra</u>
Order of Operations: BPEMDAS
- Brackets
- Parenthesis
- Exponents
- Multiplication
- Division
- Addition
- Subtraction
Step-by-step explanation:
<u>Step 1: Define</u>
P = x + y
x = 11
y = 6
<u>Step 2: Evaluate</u>
- Substitute: P = 11 + 6
- Add: P = 17
And we have our final answer!
1) We can determine by the table of values whether a function is a quadratic one by considering this example:
x | y 1st difference 2nd difference
0 0 3 -0 = 3 7-3 = 4
1 3 10 -3 = 7 11 -7 = 4
2 10 21 -10 =11 15 -11 = 4
3 21 36-21 = 15 19-5 = 4
4 36 55-36= 19
5 55
2) Let's subtract the values of y this way:
3 -0 = 3
10 -3 = 7
21 -10 = 11
36 -21 = 15
55 -36 = 19
Now let's subtract the differences we've just found:
7 -3 = 4
11-7 = 4
15-11 = 4
19-15 = 4
So, if the "second difference" is constant (same result) then it means we have a quadratic function just by analyzing the table.
3) Hence, we can determine if this is a quadratic relation calculating the second difference of the y-values if the second difference yields the same value. The graph must be a parabola and the highest coefficient must be 2
Answer:
The worker's pay is $795.50.
Step-by-step explanation:
The worker gets paid $18.50 for the first 40 hours of work. The worker works 46 hours. 18.50 • 40 = 740. He worked 6 hours overtime. $18.50 ÷ 2 = $9.25. $9.25 • 6 = $55.50.
$740 + $55.50= $795.50