Answer:
1.8m^2 approx
Step-by-step explanation:
Given data
P1= 1400N
A1=0.5m^2
P2=5000 N
A2=??
Let us apply the formula to calculate the Area A2
P1/A1= P2/A2
substitute
1400/0.5= 5000/A2
cross multiply
1400*A2= 5000*0.5
1400*A2= 2500
A2= 2500/1400
A2= 1.78
Hence the Area is 1.8m^2 approx
Answer:
Stratified Sampling
Step-by-step explanation:
Stratified sampling involves dividing the population into subpopulations that may differ in important ways. It allows you draw more precise conclusions by ensuring that every subgroup is properly represented in the sample.
To use this sampling method, you divide the population into subgroups (called strata) based on the relevant characteristic (e.g. gender, age range, income bracket, job role).
Based on the overall proportions of the population, you calculate how many people should be sampled from each subgroup. Then you use random or systematic sampling to select a sample from each subgroup.
I hope this helped!
Answer:
In seven minutes she can do 91 push ups
Step-by-step explanation:
26*3=78
78+13=91
Answer:
25 seconds
Step-by-step explanation:
Hi there!
In order to answer this question, first we need to know how many bolts per second are produced by each machine, this can be known by dividing the number of bolts by the time it takes.
For machine A:

For machine B:

So, if the two machines run simultaneously, we will have a rate of prodcution of bolts equal to the sum of both:

Now, we need to know how much time it will take to producee 200 bolts, to find this out we need to divide the amount of bolts by the production rate:

The <em>bolts</em> unit cancell each other and we are left with <em>seconds</em>

So it will take 25 seconds to produce 200 bolts with machine A and B running simultaneously.
Greetings!