Yes, going by the question above, the protocol validates Bob to Alice for the reason that the key is only shared between Bob and Alice as well as the number which is being sent randomly. Therefore the invader won’t be able to predict and response to that number. Because of the authentication protocol, that makes use of a classical cryptosystem thereby resulting into the possibility of an argument such that key finding is attainable via invader.
False because the internet connects with multiple communication networks to exchange information
Answer:

Explanation:
Router. A router is a networking device typically used to interconnect LANs to form a wide area network (WAN) and as such is referred to as a WAN device. IP routers use IP addresses to determine where to forward packets. An IP address is a numeric label assigned to each connected network device.
Fям:-
Answer:
The correct answer is C) With respect to PERT and CPM, slack is the amount of time a task may be delayed without changing the overall project completion time.
Explanation:
The CPM (Critical Path Method) method is frequently used in the development and control of projects whose tasks have a fixed duration while the PERT (Program Evaluation and Review Techniques) method is a set of techniques with the same purpose but that allows to work with tasks with estimated probability duration but not deterministic.
Both methods are based on developing a complete scheme that includes all the tasks of a project linked to each other according to their sequence, determining the duration and analyzing different ways of reconfiguring the task planning to optimize the use of the resources of according to the general objectives of the project.
There are tasks that to start performing them must have been completed one or more previous tasks. The overall duration of the project is determined by the Critical Path, which is the sequence of tasks of greater duration. The tasks belonging to the critical path have to be carried out with special care because delays in them would cause delays in the total achievement of the project. That is why these tasks have no slack.
The rest of the tasks have some slack, which is determined by the time that a previous task can be delayed without delaying the total time of completion of the project, that is, not exceeding the duration determined by the critical path.
That is that why we say that the <em>slack</em><em> is the amount of time a task may be delayed without changing the overall project completion time</em>.
Answer:
Explanation:
The following piece of code is written in Java. It creates the method as requested that takes in two generic objects and compares them using the .equals() built in Java method. This method will return True if the objects are identical or False if they are not. A test case is used in the code and the output can be seen in the attached image below.