<span>Write an equation in the standard form to represent the total rent (y) that Sam has to ... is the y-intercept of the function, and what does this tell you about the car?</span><span>
</span>
Answer: 0.9332.
Step-by-step explanation:
Claim : College Algebra final exam score of engineering majors equal to 88.
Given that : The test statistic is z equals to 1.50.
To find the p-value (Probability value), we use standard normal distribution table, and search the p-value corresponds to the z-score.
In a Standard Normal Distribution Table below, the p-value corresponds z equals 1.5 is 0.9332.
Hence, the p-value is 0.9332.
Answer:
17
Step-by-step explanation:
Given

Finding the second term of the sequence means to find
To find
substitute
into the second expression:
See the attached figure to better understand the problem
we know that
PB+BQ=1000 ft------->PB=1000-BQ-------> equation 1
in the triangle PAB
tan 50=AB/PB----------> AB=PB*tan 50------> equation 2
in the triangle ABQ
tan 25=AB/BQ------> AB=BQ*tan 25-------> equation 3
equals equation 2 and equation 3
PB*tan 50=BQ*tan 25--------> equation 4
substitute equation 1 in equation 4
[1000-BQ]*tan 50=BQ*tan 25-----> 1000*tan 50-BQ*tan 50=BQ*tan 25
BQ*[tan 25+tan 50]=1000*tan 50-----> BQ=1000*tan 50/[tan 25+tan 50]
BQ=718.76 ft
PB=1000-718.76-----> PB=281.24 ft
AB=PB*tan 50-----> 281.24*tan 50------> 335.17 ft
the answer is
335.17 ft