The velocity of an electron that has been accelerated through a difference of potential of 100 volts will be 5.93 *
m/s
Electrons move because they get pushed by some external force. There are several energy sources that can force electrons to move. Voltage is the amount of push or pressure that is being applied to the electrons.
By conservation of energy, the kinetic energy has to equal the change in potential energy, so KE=q*V. The energy of the electron in electron-volts is numerically the same as the voltage between the plates.
given
charge of electron = 1.6 ×
C
mass of electron = 9.1 ×
kg
Force in an electric field = q*E
potential energy is stored in the form of work done
potential energy = work done = Force * displacement
= q * (E * d)
= q * (V) = 1.6 ×
* 100
stored potential energy = kinetic energy in electric field
kinetic energy = 1/2 * m * 
= 1/2 * 9.1 ×
* 
equation both the equations
1/2 * 9.1 ×
*
= 1.6 ×
= 0.352 *
m/s
= 35.2 * 
= 5.93 *
m/s
To learn more about kinetic energy in electric field here
brainly.com/question/8666051
#SPJ4
Answer:
a)
b)
c)
d)
Explanation:
From the question we are told that:
Population percentage 
Sample size 
Let x =customers ask for water
Let y =customers dose not ask for water with their meal
Generally the equation for y is mathematically given by

Generally the equation for pmf p(x) is mathematically given by

a)
Generally the probability that exactly 6 ask for water is mathematically given by


b)
Generally the probability that less than 9 ask for water with meal is mathematically given by




c)
Generally the probability that at least 3 ask for water with meal is mathematically given by

![p(x\geq3)=1-[p(0)+p(1)+p(2)]](https://tex.z-dn.net/?f=p%28x%5Cgeq3%29%3D1-%5Bp%280%29%2Bp%281%29%2Bp%282%29%5D)
![p(x\geq3)=1-[0.00001+0.0015+0.0106]](https://tex.z-dn.net/?f=p%28x%5Cgeq3%29%3D1-%5B0.00001%2B0.0015%2B0.0106%5D)
![p(x\geq3)=1-[0.0122]](https://tex.z-dn.net/?f=p%28x%5Cgeq3%29%3D1-%5B0.0122%5D)

d)
Generally the mean and standard deviation of sample size is mathematically given by
Mean

Standard deviation


The answer to the question is shown below:
We all know that formula for solving work done is the force multiplied by distance covered:
Work done = Force x distance
Distance = 5m
Force = 500 N
Work done = 500 N * 5m
Work done = 2500 J