What is the meaning of point of intersection?

Mathematics
2 answers:
stellarik [79]3 years ago
8 0

Answer:

The point of intersection is the exact point where two lines cross. An example of this would be perpendicular lines.

Step-by-step explanation:

Alona [7]3 years ago
6 0

A point of intersection in a graph is the point at which two lines cross each other.

You might be interested in
PLEASE HELP IS POSSIBLE :)
Arisa [49]

Answer: 9 inches

Step-by-step explanation:

3 0
3 years ago
4 +y = 12. Substitute 8 for x.
Alexeev081 [22]

Answer:

where should I substitute 8 for x? if its like this 4(8)+y=12 than its y=-20

Step-by-step explanation:

8 0
3 years ago
Which statement best describes the polynomial 2x^3+x+5?
nalin [4]
The polynomial is not factorable with rational numbers
4 0
4 years ago
Read 2 more answers
A researcher claims that the mean of the salaries of elementary school teachers is greater than the mean of the salaries of seco
Brut [27]

Answer:

t=\frac{(48250-45630)}{\sqrt{\frac{3900^2}{26}+\frac{5530^2}{24}}}}=1.921  

df=n_{A}+n_{B}-2=26+24-2=48

Since is a one sided test the p value would be:

p_v =P(t_{(48)}>1.921)=0.0303

If we compare the p value and the significance level given \alpha=0.05 we see that p_v so we can conclude that we have enough evidence to reject the null hypothesis, and we can conclude that the mean for elementary school teachers is significantly higher than the mean for secondary teachers at 5% of significance

Step-by-step explanation:

Data given and notation

\bar X_{A}=48250 represent the mean of elementary teachers

\bar X_{B}=45630 represent the mean for secondary teachers

s_{A}=3900 represent the sample standard deviation for elementary teacher

s_{B}=5530 represent the sample standard deviation for secondary teachers

n_{A}=26 sample size selected

n_{B}=24 sample size selected  

\alpha=0.05 represent the significance level for the hypothesis test.

t would represent the statistic (variable of interest)

p_v represent the p value for the test (variable of interest)

State the null and alternative hypotheses.

We need to conduct a hypothesis in order to check if the mean of the salaries of elementary school teachers is greater than the mean of the salaries of secondary school teachers, the system of hypothesis would be:

Null hypothesis:\mu_{A}-\mu_{B}\leq 0

Alternative hypothesis:\mu_{A}-\mu_{B}>0

We don't know the population deviations, so for this case is better apply a t test to compare means, and the statistic is given by:

t=\frac{(\bar X_{A}-\bar X_{B})}{\sqrt{\frac{s^2_{A}}{n_{A}}+\frac{s^2_{B}}{n_{B}}}} (1)

t-test: "Is used to compare group means. Is one of the most common tests and is used to determine whether the means of two groups are equal to each other".

Calculate the statistic

We can replace in formula (1) the info given like this:

t=\frac{(48250-45630)}{\sqrt{\frac{3900^2}{26}+\frac{5530^2}{24}}}}=1.921  

P-value

The first step is calculate the degrees of freedom, on this case:

df=n_{A}+n_{B}-2=26+24-2=48

Since is a one sided test the p value would be:

p_v =P(t_{(48)}>1.921)=0.0303

Conclusion

If we compare the p value and the significance level given \alpha=0.05 we see that p_v so we can conclude that we have enough evidence to reject the null hypothesis, and we can conclude that the mean for elementary school teachers is significantly higher than the mean for secondary teachers at 5% of significance

5 0
3 years ago
A company manufactures two different sizes of boat lifts. The smaller lift requires 1 hour in the welding department and 2 hours
qaws [65]

Answer:

  • The solution that optimizes the profit is producing 0 small lifts and 50 large lifts.
  • Below are all the steps explained in detail.
  • The graph is attached.

Explanation:

<u />

<u>1. Name the variables:</u>

  • x: number of smaller lifts
  • y: number of larger lifts

<u></u>

<u>2.  Build a table to determine the number of hours each lift requires from each department:</u>

<u></u>

Number of hours

                                        small lift    large lift   total per department

Welding department            1x             3y                x + 3y

Packaging department        2x             1y                2x + y

<u></u>

<u>3. Constraints</u>

  • 150 hours available in welding:         x + 3y ≤ 150
  • 120 hours available in packaging:   2x + y ≤ 120
  • The variables cannot be negative:    x ≥ 0, and y ≥ 0

Then you must:

  • draw the lines and regions defined by each constraint
  • determine the region of solution that satisfies all the constraints
  • determine the vertices of the solution region
  • test the profit function for each of the vertices. The vertex that gives the greatest profit is the solution (the number of each tupe that should be produced to maximize profits)

<u></u>

<u>4. Graph</u>

See the graph attached.

Here is how you draw it.

  • x + 3y ≤ 150
  • draw the line x + 3y = 150 (a solid line because it is included in the solution set)
  • shade the region below and to the left of the line

  • 2x + y ≤ 120
  • draw the line 2x + y ≤ 120 (a solid line because it is included in the solution set)
  • shade the region below and to the left of the line

  • x ≥ 0 and y ≥ 0: means that only the first quadrant is considered

  • the solution region is the intersection of the regions described above.

  • take the points that are vertices inside the solutoin region.

<u>5. Test the profit function for each vertex</u>

The profit function is P(x,y) = 25x + 90y

The vertices shown in the graph are:

  • (0,0)
  • (0,50)
  • (42,36)
  • (60,0)

The profits with the vertices are:

  • P(0,0) = 0
  • P(0,50) = 25(0) + 90(50) = 4,500
  • P(42,36) = 25(42) + 90(36) = 4,290
  • P(60,0) = 25(60) + 90(0) = 1,500

Thus, the solution that optimizes the profit is producing 0 smaller lifts and 90 larger lifts.

3 0
3 years ago
Other questions:
  • Factor each polynomial (1)64-40ab
    5·1 answer
  • If Hannah ride a bike for 6mile per minute.how many miles can she ride in 10 Minutes
    7·1 answer
  • Find the inverse of the matrix, if it exists (Picture provided)
    9·1 answer
  • Which expressions are equivalent to <br> −f−5(2f-3)<br> Choose all answers that apply
    11·1 answer
  • Please help me! What does CI = ?
    9·1 answer
  • 3(u+5)=6u+30 please help​
    8·2 answers
  • What is the missing number in the factor tree?
    8·1 answer
  • Please help I will give a brainless or brainly
    11·2 answers
  • Help me graph the numbers
    15·1 answer
  • What is the sum of 7x/ x^2 - 4 and 2 / x + 2?
    10·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!