Answer:
Step-by-step explanation:
The starting equation is
12-(3x+13)=0
First add 3x+13 to both sides so that only 12 is on the left
12=3x+13
now subtract 13 from both sides to isolate your variable
-1=3x
Finally divide both sides by 3 to get your final answer
x=-1/3
Answer: Correct critical value = 2.2622
Step-by-step explanation:
Confidence interval for population mean when population standard deviation is unknown:
, where
= sample mean, n= sample size, s= sample standard deviation,
= two-tailed t value.
As per given: n= 10
degree of freedom : df = n-1=9

Critical t-value : 
So, the 95 percent confidence interval estimate for the mean :

The 95 percent confidence interval estimate for the mean:(190.14, 295.06)
F(x)=2x-10
y=2x-10
x=2y-10
x+10=2y-10+10 (add both sides by 10)
2y=x+10
2y/2=x+10/2 (divide both sides by 2)
y=1/2x+5
Final Answer: f^-1(x)=1/2x+5
$16.14 =pants
Explanation:
$25-$7.28=17.72
17.72/2 =8.86
8.86+7.28=16.14
25-16.14=8.86 shirt
I hope that helped ..
Since the number of days in July and in August is the same, there is no need to work out on the total number per month.
The mean number of people per day in August = 160 + 20 = 180
Answer: 180