Answer:
C
Step-by-step explanation:
You know that if its < or >, the line is - - - -, not a fully dark line.
So it would be either A or C
Plot in some numbers for x
Less than would be to the left.
So it wouldn't be A, leaving us with C
Answer:
s(t) = -4.9t² + 39.2t
Step-by-step explanation:
Given the projectile motion of an object can be modeled using s(t) = gt2 + v0t + s0, where g is the acceleration due to gravity, t is the time in seconds since launch, s(t) is the height after t seconds, v0 is the initial velocity, and s0 is the initial height. The acceleration due to gravity is –4.9 m/s²
Given
g = -4.9m/s²
v0 = 39.2m/s
s0 = 0m (the initial height)
On substituting into the formula;
s(t) = gt² + v0t + s0
s(t) = -4.9t² + 39.2t + 0
s(t) = -4.9t² + 39.2t
This gives the equation that models the height
Answer: 3/5
Step-by-step explanation:
Probabilty of blue tiles: 12/20 =3/5
Probability of letter b tiles: 10/20= 1/2
How to get the denominator?
4+6=10
2+8=10
10+10=20
Check out the attached photo
are those the options? something is wrong here and I'm not sure what. I'm sorry if this is wrong, I tried my best
Answer:
-2,928
Step-by-step explanation:
12 ( 32 - [ 23 • 12 ] )
order of operations PEMDAS ( parenthesis, exponents, multiplication/division, addition/subtraction )
23 • 12 = 276
12 ( 32 - 276 )
12 ( -244 )
-2,928