Answer:
2
Step-by-step explanation:
9(x+1)=25+x
9x+9=25+x
9x-x=25-9
8x=16
x=16/8
x=2
Answer:
The train going 30 miles in 1/3 hour is going faster than the other train.
Step-by-step explanation:
Calculate each rate by dividing the distance traveled by the amount of time it takes to cover that distance:
30 / (1/3) = 90 mph
20 / (1/2) = 40 mph
Answer:

Step-by-step explanation:
A highway engineer wants to compute the change in elevation of a section of road. The horizontal distance of this section of road is 2km and downgrade is 8%
The slope formula is given by

m = 8% = 8/100
run = y = 2km




Verification:
%
Answer:
Answer is explained in the attached document
Step-by-step explanation:
Hessenberg matrix- it a special type of square matrix,there there are two subtypes of hessenberg matrix that is upper Hessenberg matrix and lower Hessenberg matrix.
upper Hessenberg matrix:- in this type of matrix zero entries below the first subdiagonal or in another words square matrix of n\times n is said to be in upper Hessenberg form if ai,j=0
for all i,j with i>j+1.and upper Hessenberg matrix is called unreduced if all subdiagonal entries are nonzero
lower Hessenberg matrix:- in this type of matrix zero entries upper the first subdiagonal,square matrix of n\times n is said to be in lower Hessenberg form if ai,j=0 for all i,j with j>i+1.and lower Hessenberg matrix is called unreduced if all subdiagonal entries are nonzero.
pls mark as brainlist
Step-by-step explanation:
624 divided by 8 = 78