27-18=9 (difference between)
9/18=0.5 (9 as a percentage of original as a decimal)
0.5x100=50 (as a percentage)
50% increase
Answer:
= 426 1/4 hr.
Step-by-step explanation:
5 1/2 = 5.5 Days in a week
7 3/4 = 7.75 hr. Per Day
Total hours in a week = 5.5 × 7.75 = 42.625 hr in a week
In 10 weeks = 42.625 × 10 = 426.25 hr.
Do not go to that link it is a virus and if you go to “goggle” and press the camera icon on the top right and take a picture of the question you should get the answer there
Do you have a graphing calculator? if yes than all you have to do is hit the y= button in the top left corner and type 1/4x-4 for y1. then you need to hit graph in the top right corner. repeat this process substituting 1/4x-4 and -x+1
1/2,2/4,3/8 and 6/16 could i plz get a brainly i just need one