Answer:
$ 71.5
Step-by-step explanation:
firstly kilometer to meters
<em>1 km = 1000 m </em>
therefore 3 km = 3000m
for the first 500 = $40
hence deduct the 500 from 3000m
3000 - 500 = 2500
now find out how many 300m go into 2500
2500 / 300 = 8.33
which is rounded up to 9
therefore the total amount is :
40 + 9 * 3.5
<u>= $71.5</u>
<u></u>
Answer:
x = 6
Step-by-step explanation:
20 = 7x + 2 - 4x
7x + 2 - 4x = 20 (switch the sides)
7x - 4x + 2 = 20 (group the like terms together)
3x + 2 = 20 (add similar numbers, in this case it's the both x's)
-2 -2 (subtract 2 on both sides)
------------------
3x = 18
/3 /3 (divide both sides by 3)
-------------------
x = 6
Answer: There are no solutions.
Step-by-step explanation:
Answer:
$324.37
Step-by-step explanation:
First question already answered in other post.
Second Question:
Original price before discount and tax: $354
Discount: 15%
100% - 15% = 85% = 0.85
0.85 * $354 = $300.90
Tax: 7.8%
100% + 7.8% = 107.8% = 1.078
1.078 * $300.90 = $323.37
Answer: $324.37
Answer:
137 ft²
Step-by-step explanation:
The shop is rectangular in shape. The area of a rectangle is given by:
Area = length * width
Since the length of the shop = 20 ft and the width = 10 ft, therefore:
Area of the shop = length * width = 20 ft * 10 ft = 200 ft²
The part that would not be tiled is of triangular shape. The area of a triangle is given as:
Area = (1/2) * base * height
The base of the triangle = 18 ft, the height = 7 ft. Hence:
Area of non tiled part = (1/2) * base * height = (1/2) * 18 ft * 7 ft = 63 ft²
The total square feet of tile needed to complete the job = Area of shop - Area of non tiled part
The total square feet of tile needed to complete the job = 200 ft² - 63 ft² = 137 ft²