Weighted Shortest Job First gives preference to jobs with characteristics such as, first, the size of the project (smaller is better) Second, the value of the project (higher is better).
In order to determine a relative ranking, Weighted Shortest Job First (WSJF) uses a technique for assigning a weight, or value, to each job, and then by dividing that by the length of the job. It also gives preference to jobs with characteristics such as the size and value for a project.
Weighted Shortest Job First is a prioritization model used to sequence jobs eg., capabilities, features, and epics in order to produce maximum economic benefit.
Hence, WSJF prefers such characteristics.
To learn more about a project here:
brainly.com/question/14546345
#SPJ4
The link is very good to explain what you need but something it forgot was needing to know about foreign pathways
Answer:
Present Value = $22,663.69
Explanation:
<em>The present value of a sum expected in the future is the worth today given an opportunity cost interest rate. In another words ,it is amount receivable today that would make the investor to be indifferent between the amount receivable today and the future sum.</em>
The present value of a lump sum can be worked out as follows:
PV = FV × (1+r)^(-n)
PV - Present value - ?
FV - Future value - 26,800
r- Interest rate per period - 4.28%
n- number of periods- 4
PV = 26,800 × (1.0428)^(-4)=22,663.69
PV = $22,663.69
Answer: 20,000 lawn mowers
Explanation:
The formula for calculating the number of lawn mowers needed to reached the budgeted profit levels is:
= (Fixed costs + Budgeted profit) / Contribution margin
Contribution margin = Selling price - Variable cost
= 40 - (14 + 8 + 5)
= 40 - 27
= $13
Number of lawn-mowers required:
= (140,000 + 120,000) / 13
= 20,000 lawn mowers