Answer:
4 weekdays and 2 weekends.
Step-by-step explanation:
6 days.
x = weekdays
y = weekends
7x = amount with weekdays
12y = amount with weekends
7x + 12y = 52, total
x + y = 6, amount of days
solve double variable equation
x = 6 - y, plug in to 1st equation
7(6 - y) + 12y = 52
42 - 7y + 12y = 52
5y = 10
y = 2 weekends
2 + x = 6
x = 4 weekdays
Answer:
y = 2x - 7
Step-by-step explanation:
To find the line equation we assume that its form is y = m*x + b. Where m is the slope and b is the independent variable that intercepts the Y axis.
If we have two points as P1=(x1,y1) and P2=(x2,y2) we can use the slope formula as:
m = (y2-y1)/(x2-x1)
The points given are P1=(7,7) and P2=(2,-3), then the using the slope formula we obtain:
m = (-3-7)/(2-7)
m = (-10)/(-5)
m = 2
By now the equation is y = 2x + b. To find the value of b we have to replace in the equation any point, in this case i am using P2:
-3 = 2*(2) + b
-3 = 4 + b
-3 -4 = b
-7 = b
Therefore the equation of the line is:
y = 2x - 7
80 * 3.5 = 280
she travels around 280km in 3.5 hours.
Answer:
width = 2.5 feet
Step-by-step explanation:
Suzanne has a rectangular garden which is 18 feet long and 11 feet wide.
Area of the garden = length times width = 18 times 11= 198 square foot
Let 'w' be the width of the border
Length of the garden with border = 18+2w
Width of the garden with border = 11+2w
Area of the garden with border = 
Area of the border = 
She has 168 square foot of paving stones,

Solve for w
apply quadratic formula
a= 4, b= 58 and c=-168



we get two values for w


It's 48 because 23+48=71
So 71-48=23