Answer:
2, 3, 5
Step-by-step explanation:
The question asking for the linear equation Suzie manipulated. The answer should be equal to the starting equation. So, we just need to manipulate the option to y= mx + c format.
1. y + 7x = 23
y= -7x +23 (false)
2. . –7x + y = 23
y= 7x + 23 (true)
3. 2y – 14x = 46
2y= 14x+ 46
y= 7x +23 (true)
4. y – 7x = –23
y= 7x - 23 (false)
5. 7x – y = –23
-y= -7x -23
y= 7x + 23 (true)
Answer:
a = 30
b = 15
c = 3
d = 30
e = 10
f = 20
Step-by-step explanation:
60 deg and a + 30 are alt int <S and congruent
a + 30 = 60
a = 30
a + 30 and a + 2b are corresponding angles and congruent
a + 2b = a + 30
2b = 30
b = 15
a + 2b and 5b - 5c are vertical angles and congruent
5b - 5c = a + 2b
5(15) - 5c = 30 + 2(15)
75 - 5c = 30 + 30
75 - 5c = 60
-5c = -15
c = 3
a + 2b and 10c + d are corresponding angles and congruent
10c + d = a + 2b
10(3) + d = 30 + 2(15)
d + 30 = 60
d = 30
5b - 5c and 2d + 6e are supplementary and add to 180
5b - 5c + 2d + 6e = 180
5(15) - 5(3) + 2(30) + 6e = 180
75 - 15 + 60 + 6e = 180
6e + 120 = 180
6e = 60
e = 10
2d + 6e and 4f + 4e are alt int angles and congruent.
4f + 4e = 2d + 6e
4f + 4(10) + 2(30) + 6(10)
4f + 40 = 60 + 60
4f + 40 = 120
4f = 80
f = 20
<span>7^2•3^2+(1+2)^0•3-4^2•1
= 49</span>•9 + 1•3 - 16<span>•1
= 441 + 3 - 16
= 428</span>
Answer:
0.726 is the probability that the project will be completed in 33 days or less.
Step-by-step explanation:
We are given the following information in the question:
Mean, μ = 30 days
Variance = 25 days
Standard Deviation,

We assume that the distribution of path length is a bell shaped distribution that is a normal distribution.
Formula:

P(completed in 33 days or less)
Calculation the value from standard normal z table, we have,

0.726 is the probability that the project will be completed in 33 days or less.