Answer:
4 is always correct
Step-by-step explanation:
Answer:
3022.08 . . . dollars per square meter
Step-by-step explanation:
The slope is multiplied by the factor that changes units:
(280.76 dollars/ft²)×(1 ft²)/(.092303 m²) ≈ 3022.08 dollars/m²
It's a equilateral triangle with each side being equal to the radius.
So the area is
Answer:
42.
Step-by-step explanation:
18/3 = 6 jars per day
6*7=42