1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
agasfer [191]
3 years ago
9

A freight train travels at 30 mph. If the freight train is 300 miles ahead of an express train traveling at 55 mph, how long wil

l the express train take to overtake the freight train?
Mathematics
1 answer:
nikdorinn [45]3 years ago
7 0
Let the time elapsed be x, then
30x + 300 = 55x
55x - 30x = 300
25x = 300
x = 300/25 = 12

Therefore, it will take the express train 12 hours to overtake the freight train.
You might be interested in
What is the sum of 10/12and 11/12? Make sure to show all work to receive full credit!
sergiy2304 [10]

Answer:

1\frac{3}{4}

Step-by-step explanation:

\frac{10}{12} +\frac{11}{12} \\\\\frac{21}{12} \\\\1\frac{9}{12} \\\\1\frac{3}{4}

7 0
3 years ago
Are the expressions (-2)^4 and -2^4 equivalent? Explain how you know.
Elden [556K]
No, becasue of PEMDAS
so parenthasees first
exponents next
mulitplciation next

(-2)^4=-2 times -2 times -2 times -2=positive number since even number of negative signs

-2^4=-1 times 2^2=-1 times 2 times 2 times 2 times 2=negative number since odd number of negative signs
3 0
3 years ago
Read 2 more answers
What is two numbers that when added equal 25 but when multiplied equal negative 200
Law Incorporation [45]
Well lets look at it lets find multiples that equal 200 when multiplied first to get rid of extra work 

so i just took a couple of guesses and lined them up 
i got really close when i did this one 
-200/30 = -6.666666667
30 + 6.666666667 = 23.33333333
see not quite there almost 25 but not far enough 
so ill try to move the numbers around little by little. 
-200/29.5 = -6.779661017
29.5 + -6.779661017 = 22.72033898
okay honestly after i finished this trial i wasn't sure if i was thinking straight because i completely didnt think about which way i needed to go so now i pinched myself and this time we might head the right way lol
-200/30.5 = -6.557377049
30.5 + -6.557377049 = 23.94262295
so obviously we need to move up alittle more 
-200/31 = -6.451612903
31 + -6.451612903 = 24.5483871
HEY LOOK WE ARE ALMOST THERE!! lets try some more;)
-200/31.5 = -6.349206349
31.5 + -6.349206349 = 25.15079365
see we are at 25! but lets try to get rid of as many numbers behind it as possible.
-200/31.4 = -6.369426752
31.4 + -6.369426752 = 25.03057325
getting closer...
-200/31.39 = -6.371455878
31.39 + -6.371455878 = 25.01854412
what does this mean? this means we can go lower... sooo here we go 
-200/31.38 = -6.373486297
31.38 + -6.373486297 = 25.0065137
i guess we can try lower..
-200/31.37 = -6.375518011
31.37 + -6.375518011 = 24.99448199
wait! before you leave! try 31.379
-200/31.379 = -6.37368941
31.379 + <span>-6.37368941 = 25.00531059
</span>okay so yes, i am taking the very long way but good comes to those with patience:D lets try making the third place after the decimal a little bit lower
-200/31.377 = -6.374095675
31.377 + -6.374095675 = 25.00290432
yes we can take it lower so lets make it the best answer 
-200/31.376 = -6.374298827
31.376 + <span>-6.374298827 = 25.00170117
</span>i pray this be over soon^ lets try again....
-200/31.375 = -6.374501992
31.375 + -<span>6.374501992 = 25.00049801
</span>okay im a perfectionist... sooo lets go lower
-200/31.374 = -6.37470517
31.374 + <span>-6.37470517 = 24.99929483
</span>okay so we went to low on the third place. and of course i am moving to the fourth place...
-200/31.3749 = -6.374522309
31.3749 + <span>-6.374522309 = 25.00037769
</span>okay we can move lower on that place....
-200/31.3748 = -6.374542627
31.3748 + <span>-6.374542627 = 25.00025737
</span>lets try to move this along faster...
-200/31.3746 = -6.374583262
31.3746 +<span> -6.374583262 = 25.00001674 
</span>every number counts literally so moving lower 
-200/31.3744 = -6374623897
31.3744 + <span>-6374623897 = 24.9997761 
we gotta put a 9 on our fifth place from our decimal sooo here we go again
-200/31.37449 = -6.374605611
31.37449 + </span><span>-6.374605611 = 24.9998439
<span>OMG DO YOU UNDERSTAND WHAT THIS MEANS!!?!?!
</span>okay that means our answer was two trials ago solved 
in other words our two numbers arreee
</span><span> 31.3746
</span><span>-6.374583262
</span>hallelujah we are finished and if this is wrong i will pull my hair out.  
7 0
4 years ago
Nemecek Brothers make a single product on two separate production lines, A and B. Its labor force is equivalent to 1000 hours pe
frez [133]

Answer:

(a) The inequality for the number of items, x, produced by the labor, is given as follows;

250 ≤ x ≤ 600

(b) The inequality for the cost, C is $1,000 ≤ C ≤ $3,000

Step-by-step explanation:

The total time available for production = 1000 hours per week

The time it takes to produce an item on line A = 1 hour

The time it takes to produce an item on line B = 4 hour

Therefore, with both lines working simultaneously, the time it takes to produce 5 items = 4 hours

The number of items produced per the weekly labor = 1000/4 × 5 = 1,250 items

The minimum number of items that can be produced is when only line B is working which produces 1 item per 4 hours, with the weekly number of items = 1000/4 × 1 = 250 items

Therefore, the number of items, x, produced per week with the available labor is given as follows;

250 ≤ x ≤ 1250

Which is revised to 250 ≤ x ≤ 600 as shown in the following answer

(b) The cost of producing a single item on line A = $5

The cost of producing a single item on line B = $4

The total available amount for operating cost = $3,000

Therefore, given that we can have either one item each from lines A and B with a total possible item

When the minimum number of possible items is produced by line B, we have;

Cost = 250 × 4 = $1,000

When the maximum number of items possible, 1,250, is produced, whereby we have 250 items produced from line B and 1,000 items produced from line A, the total cost becomes;

Total cost = 250 × 4 + 1000 × 5 = 6,000

Whereby available weekly outlay = $3000, the maximum that can be produced from line A alone is therefore;

$3,000/$5 = 600 items = The maximum number of items that can be produced

The inequality for the cost, C, becomes;

$1,000 ≤ C ≤ $3,000

The time to produce the maximum 600 items on line A alone is given as follows;

1 hour/item × 600 items = 600 hours

The inequality for the number of items, x, produced by the labor, is therefore, given as follows;

250 ≤ x ≤ 600

8 0
3 years ago
A company rents water tanks shaped like cylinders. Each tank has a radius of 3 feet and a height of 2 feet. The cost is $4 per c
vivado [14]

Answer:

Cost to rent one tank=226.08 Dollars

Step-by-step explanation:

Radius of the cylindrical tank=3 feet

Height of the tank= 2 feet

Cost to rent one tank= Volume of one tank * cost to rent one cubic feet of volume

Volume of the cylindrical tank:

                                         =\pi r^2

As,  \pi =\frac{22}{7}=3.14

Putting the values in the formula:

Volume of the tank:

                                    =3.14*(3*3)*2\\\\=3.14*9*2\\\\=3.14*18\\\\=56.52feet^3

Cost to rent one cubic feet= 4 Dollars

Cost to rent 56.52 Cubic feet of one tank;

   = 4*56.52

=226.08 Dollars

5 0
3 years ago
Other questions:
  • A rectangle has an area of 72 in². The length and the width of the rectangle are changed by a scale factor of 3.5. What is the a
    10·1 answer
  • What is the square root of 2131?
    6·1 answer
  • What are the domain restrictions of the expression h^2+3h−10/h^2−12h+20 ?
    11·2 answers
  • The perimeter of a triangle
    5·1 answer
  • Which of these groups of relative frequencies would be best represented by a pie chart?
    14·1 answer
  • Which comparison is not correct?
    9·1 answer
  • The angle of elevation from the base to the top of a waterslide is 13 degrees. The slide extends horizontally 58.2 meters. Appro
    10·1 answer
  • A cone and a cylinder have the same radius and height. The volume of the cone is 100π (pi) cubic feet. What is the volume of the
    6·1 answer
  • √(2x-5)=1+√(x-3)
    14·1 answer
  • Tim has £750.<br> Liz has £659.<br><br> Work out much more money Tim has.
    13·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!